Description
Florida Keys Electric Cooperative Association, Inc. (FKEC) is seeking proposals for a turn‑key, all‑dielectric self‑supporting (ADSS) fiber‑optic line installation that will connect the Crawl Key Substation to the Marathon Substation. The scope includes design, permitting, construction, splicing, and testing of the fiber line, as well as associated vault and conduit work. A full bid package with specifications, permits, design drawings, and supporting documents is available for download.
• Turn‑key ADSS fiber optic line from Crawl Key to Marathon Substation
• Includes design, permits (ACOE, FDOT, FDEP), construction, splicing, and testing
• Required deliverables: detailed engineering, construction drawings, vault design, splicing diagrams, and compliance with all local permits
• Bid deadline: August 27, 2026 (same‑day opening and close)
• Bid bond: 5 % of not‑to‑exceed price; e‑bidding enabled
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
(305) 852-2431