Description
The City of Harrisonville is seeking a contractor to replace a 60‑inch‑diameter HDPE storm‑water pipe along Andrea Lane. The scope includes removal of the existing 60‑inch CMP, installation of 166 linear feet of new 60‑inch HDPE pipe, and all associated site work such as mobilization, demolition, excavation, backfilling, compaction, grading, and site restoration. Bidders must submit a bid bond of 5 % of the total bid amount and comply with prevailing‑wage, nondiscrimination, tax‑exempt, federal work‑authorization, and safety‑training requirements.
• Replace 166 LF of 60‑inch HDPE pipe (civil infrastructure)
• Provide full labor, materials, equipment, and related site work (excavation, backfill, grading)
• Comply with Missouri prevailing‑wage laws, safety training, and federal work‑authorization affidavits
• Submit sealed proposals by 2:00 PM on 15 Sept 2026; bid bond required (5 % of bid)
• All work must follow the city’s plans, specifications, and contract documents.
Attached files
The solicitation documents live at the source — open the bid source above to download them.