Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Missouri
  4. ›Closed bids
  5. ›SW 2025-02 203 Andrea Lane Storm Water Improvements

City of Harrisonville·Missouri

SW 2025-02 203 Andrea Lane Storm Water Improvements

Closes 9/15/2026$100k – $300kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Harrisonville is seeking a contractor to replace a 60‑inch‑diameter HDPE storm‑water pipe along Andrea Lane. The scope includes removal of the existing 60‑inch CMP, installation of 166 linear feet of new 60‑inch HDPE pipe, and all associated site work such as mobilization, demolition, excavation, backfilling, compaction, grading, and site restoration. Bidders must submit a bid bond of 5 % of the total bid amount and comply with prevailing‑wage, nondiscrimination, tax‑exempt, federal work‑authorization, and safety‑training requirements. • Replace 166 LF of 60‑inch HDPE pipe (civil infrastructure) • Provide full labor, materials, equipment, and related site work (excavation, backfill, grading) • Comply with Missouri prevailing‑wage laws, safety training, and federal work‑authorization affidavits • Submit sealed proposals by 2:00 PM on 15 Sept 2026; bid bond required (5 % of bid) • All work must follow the city’s plans, specifications, and contract documents.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

JC Johnson(Street Supervisor)

[email protected]

(816) 380-8951

Key dates

Opened
8/26/2026
Closes
9/15/2026
Duration
2 weeks

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
SW 2025-02 203

Budget estimate

$100,000 – $300,000

Based on typical costs for 60‑inch HDPE pipe installation (approximately $500‑$800 per linear foot) and additional site‑work items, the total contract value is likely in the $100,000‑$300,000 range. The lower end assumes minimal mobilization and straightforward excavation, while the higher end reflects full mobilization, complex site conditions, and required safety and compliance measures.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.