The project calls for complete demolition of an existing garage at 800 Zerega Avenue, followed by the design‑build construction of a replacement garage, and the construction of a new “swing space” at 530 Zerega Avenue in the Bronx. The scope includes extensive site work, new foundations, structural steel, masonry, full mechanical/electrical/plumbing systems, underground fuel‑storage tanks, hazardous‑material handling, environmental compliance (SPCC plan, VOC limits), and coordination with a nearby DEP pump‑station rehabilitation. The contract is a PLA‑mandated competitive sealed‑bid with a combination lump‑sum, unit‑price, and allowance pricing structure, and it includes significant M/WBE participation requirements and extensive reporting (employment reports, hazardous‑materials management, as‑built documentation).
• Demolition of the existing garage and disposal of debris.
• Construction of a new multi‑story garage (structural steel, concrete, roofing, elevators, bridge crane, fuel‑storage tanks, EV‑charging stations).
• Construction of a “swing space” building on the south lot with full MEP systems.
• Comprehensive site‑wide services: traffic control, temporary utilities, de‑watering, hazardous‑material handling, SPCC plan, VOC‑compliant paints/coatings, LEED‑Silver target, and coordination with DEP CSO replacement.
• Mandatory Project Labor Agreement compliance, M/WBE subcontractor utilization (19 % overall), and extensive post‑award documentation (as‑built drawings, operation & maintenance manuals, insurance, bonds, employment reports).