This addendum clarifies the requirements for the Roosevelt Elementary School Playground Replacement project. The contractor will be responsible for full demolition of existing playground elements, installation of new concrete paving, a pouredâinâplace rubberâurethane surfacing system, stabilized decomposed granite pathways, turf, new irrigation infrastructure, and comprehensive treeâprotection and landscaping. The scope also includes extensive submittal documentation, changeâorder management, and compliance with safety, environmental, and accessibility standards.
⢠Demolition of existing playground, surfacing, and related hardscape while protecting trees and utilities.
⢠New concrete basemat, curbs, gutters, and a twoâlayer rubberâurethane playground surfacing (Superâ7 or Extremeâ10) with warranty.
⢠Installation of stabilized decomposed granite, AG sod, and a new irrigation system, plus treeâprotection plan and landscaping per design.
⢠Detailed submittals, schedule of values, allowances (e.g., $45 k playground allowance), and strict changeâorder procedures.
⢠Compliance with California State Architect specifications, safety (NFPA 241), stormâwater control, and accessibility requirements.