The San Gabriel Unified School District is seeking a qualified general contractor to replace the existing playground at Roosevelt Elementary School. The work includes demolition of current equipment and surfacing, extensive site preparation, installation of new concrete, asphalt, grading, irrigation, turf, playground equipment, gate hardware, and related landscaping, while protecting existing trees and site improvements. The contract is a lump‑sum agreement with a Schedule of Values and includes three cash allowances for playground equipment, unforeseen underground conditions, and gate hardware, plus a 5 % line‑item for close‑out documentation. Strict safety, background‑check, documentation, and schedule requirements are mandated throughout the project.
• Demolition, earthwork, concrete, asphalt, grading, irrigation, turf, and new OFCI playground equipment installation.
• Three cash allowances: $45,000 (playground equipment), $35,000 (unforeseen underground utilities), $10,000 (gate hardware).
• Comprehensive procedural requirements: weekly coordination, 2‑week look‑ahead schedules, 7‑day safety plan submission, 48‑hour off‑hour work notice, and extensive close‑out documentation.