This opportunity involves the demolition, renovation, and new construction of Building 7037 at Tinker Air Force Base, Oklahoma, to create a dedicated drug‑testing office. The scope includes complete interior demolition, new structural additions (~2,500 sf), installation of mechanical, electrical, plumbing, fire‑protection, and security systems, interior fit‑out, site grading, erosion control, and all associated permitting and inspection requirements. The contract will be awarded to a qualified General Contractor (MAC BOA holder) who must attend a mandatory site visit on July 15 2026 and submit a proposal (deadline TBD). The work is governed by Air Force Materiel Command specifications and requires compliance with prevailing‑wage determinations, OSHA VPP, and various federal environmental and safety regulations.
• Demolition of existing interior finishes, utilities, and exterior paving, followed by construction of a 2,500 sf addition and full building renovation.
• Multi‑disciplinary MEP installations, fire‑alarm/mass‑notification, security access‑control, and HVAC upgrades per detailed design drawings.
• Mandatory initial site visit (July 15 2026) for eligibility; extensive submittal and documentation requirements (schedule, QC plan, O&M manuals, certifications).