The City of Walnut Grove is seeking qualified contractors to replace a damaged culvert under Industrial Parkway and to regrade and stabilize multiple ditch sections along Park Street within the public rightâofâway. The work must follow GDOT specifications, include utility coordination, traffic lane closures, and erosion control measures, and be completed no later than November 15, 2026. The contract will be awarded to the bestâvalue bidder (or lowest responsive bidder if qualifications are equal) and requires submission of a fee proposal, schedule, qualifications, references, subcontractor list, performance bond, insurance certificates, and compliance documents.
⢠Replace CMP culvert under Industrial Parkway, increase size to 30âł, install safety flared ends, backfill with 57âstone and compacted GAB, and pave final 6âł.
⢠Relocate culvert 2 ft farther from Park Street edge.
⢠Regrade, fill, and stabilize eroded ditch sections (60 ft ROW) with BMPs, flatâbottomed ditches, grassing, fertilization, and sod installation.
⢠Manage traffic lane closures and coordinate with Walton County School System and utility providers.
⢠Complete all work by 11/15/2026, adhering to specified workâhour restrictions.