Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Big Piney Office Interior Sewer Line Replacement
More bids in Wyoming →

U.S. Department Of Agriculture·Wyoming

Big Piney Office Interior Sewer Line Replacement

Closes 9/14/2026$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The USDA Forest Service is seeking a qualified contractor to replace an interior sewer line at the Big Piney Ranger Station on the Bridger‑Teton National Forest in Wyoming. The work includes demolition of existing flooring and a concrete slab along an 81‑foot section of sewer line, disconnecting and reconnecting 17 plumbing fixtures, installing a new sewer pipe, patching the concrete slab, restoring aggregate, and reinstalling finished flooring. All demolition debris must be removed and disposed of properly. The contractor must submit a detailed method statement for the sewer line replacement and identify the areas impacted by demolition. The period of performance is November 1 2026 through January 29 2027. • Location: Big Piney Ranger District, Big Piney, WY (Bridger‑Teton National Forest) • Scope: Demolition, sewer line removal & replacement, concrete repair, flooring restoration, disposal of waste • Length of sewer line: 81 ft; 17 fixtures to be disconnected/reconnected • Required materials and labor provided by contractor • Method statement required in the quote • Period of performance: ~3 months (Nov 1 2026 – Jan 29 2027) • NAICS code indicated: 237110 (Water & Sewer Line Construction) • Primary contact: Terri Tucker, Contract Specialist (email provided)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Terri Tucker(Contract Specialist)

[email protected]

Key dates

Opened
9/1/2026
Closes
9/14/2026
Duration
3 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
1240LT26Q0154

Budget estimate

$200,000 – $500,000

No contract value is disclosed. Based on typical interior sewer line replacements of ~80 ft, demolition of flooring, concrete slab work, and flooring reinstall in a remote forest facility, a reasonable estimate would be between $200,000 and $500,000. Factors influencing the range include the chosen replacement method (traditional pipe vs. cure‑in‑place epoxy), material costs, disposal fees for demolition waste, and any accelerated schedule requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.