The Ohio State University is seeking a general‑contractor to replace the existing cage‑washer system in the basement of its Psychology Building, including demolition of the old unit, associated walls, pit, and door, and installation of a new Tecniplast cage‑washer with associated utility upgrades such as a new compressor. The work must be performed after normal operating hours, complies with a full suite of Ohio building, mechanical, electrical, and fire‑protection codes, and includes mandatory EDGE program participation (5 % target) and OBWC‑approved SUPR enrollment. The contract is a single‑prime general contract valued at approximately $298 k, with a 69‑day substantial‑completion schedule from notice to proceed.
• Replace and install a laboratory cage‑washer system (Tecniplast) with new pit, walls, and floor finishes.
• Perform related mechanical, plumbing, electrical, HVAC, and fire‑stop work to integrate the new equipment, including a new compressor, air dryer, and associated piping.
• Meet all prevailing‑wage, domestic‑steel, EDGE, and substance‑use‑prevention requirements, and coordinate noisy work after normal hours.