Description
The State of Iowa is seeking to replace the Water Treatment Control System at the Fort Dodge Correctional Facility. The proposed system shall include a wall-mounted analyzer panel capable of real-time pH and temperature monitoring with a programmable controller and data logging capability. It must feature an in-line modular sensor housing, a resistance thermometer, and associated plumbing, wiring, and pressure regulation components including backflow preventer. The chemical feed system must consist of a pre-assembled, skid-mounted dual-pump sodium hydroxide injection package.
• The system must be factory tested, rated for continuous industrial use, and compliant with applicable safety and performance standards.
• The selected contractor will be responsible for delivery, installation, integration with existing water systems, and startup testing.
• Pricing shall be all-inclusive.
• A site visit may be scheduled upon request.
Attached files
The solicitation documents live at the source — open the bid source above to download them.