Description
The City of Reno is soliciting bids for the Booth Street Siphon Rehabilitation Project (Contract I400118‑C). The work involves installing a new 24‑inch gravity sewer main, constructing a downstream siphon access vault, modifying the existing Booth Street siphon, building a new 72‑inch sanitary sewer manhole, providing electrical conduit, bypass pumping, de‑watering, utility protection, and restoring the roadway and sidewalks. The contract value is estimated between $1.6 M and $1.8 M, with a 120‑working‑day schedule and liquidated damages of $1,000 per day for overruns.
• Install 24‑in. gravity sewer main and associated vaults/manholes.
• Perform utility coordination, electrical conduit, bypass pumping, de‑watering, and traffic control.
• Restore pavement, asphalt, curb, gutter, and sidewalks; include temporary and permanent surface work.
Attached files