Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Georgia
  4. ›Construction
  5. ›QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement…

City of Atlanta·Georgia

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026$5M – $20MRequest for Proposal
Get bids like this by emailBid source

Description

The City of Atlanta is seeking qualified firms to design and construct Phase I of the Marietta Road Bridge Replacement over the former CSX Tilford Yard. The existing bridge is weight‑limited to 10 tons and must be replaced with a new structure that meets current load and safety standards, ensuring uninterrupted traffic flow on Marietta Road. The scope includes demolition of the existing bridge, site preparation, design, permitting, construction of the new bridge, and related civil works. • Replace a weight‑limited bridge with a new, higher‑capacity structure. • Perform demolition, site work, and new bridge construction. • Provide design, engineering, and permitting services. • Ensure compliance with local, state, and federal regulations. • Maintain traffic continuity during construction.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Malik Gill(Buyer)

[email protected]

Key dates

Opened
10/21/2026
Closes
11/23/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
1270086

Budget estimate

$5,000,000 – $20,000,000

No budget is disclosed, but bridge replacement projects of this scale typically range from several million to tens of millions of dollars. Assuming a moderate two‑lane bridge with standard materials and site conditions, a reasonable estimate would be between $5 million and $20 million, depending on design complexity, material costs, and contingency allowances.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia City of Atlanta·Georgia

Top match · 93%

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

Georgia Department of Transportation·Georgia

86% match

RFP-484-09042026CMGC SR 9/US 19 at CSX Bridge Replacement

Closes 11/19/2026Opened 9/4/2026

Georgia Cobb County Department of Transportation·Georgia

84% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of St. Louis Board of Public Service·Missouri

83% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

City of Charlotte·North Carolina

82% match

Morris Field Bridge Replacement

Rolling / TBD closeOpened 5/1/2026

Arkansas

82% match

bids - replace I-55 bridge

Rolling / TBD closeOpened 10/11/2026

City of St. Louis Board of Public Service·Missouri

81% match

Union/Lindell Bridge Replacement (STP‑9901(663))

Closes 10/27/2026Opened 9/16/2026

Georgia City of Chattahoochee Hills·Georgia

81% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

City of St. Louis·Missouri

81% match

Union Lindell Bridge Replacement

Closes 10/27/2026Opened 9/16/2026

Georgia Department of Transportation·Georgia

81% match

T32-D6-Bridge Drift SR3 A1 Bartow-193903

Closes 10/27/2026Opened 10/8/2026

Maryland Transportation Authority·Maryland

81% match

Demolition of Remaining FSK Bridge and Miscellaneous Marine Work

Closes 10/22/2026Opened 8/25/2026

Georgia Department of Transportation·Georgia

81% match

T32-D6-Bridge Drift SR61 Gordon-193904

Closes 10/27/2026Opened 10/8/2026

Missouri Department of Transportation·Missouri

81% match

STL District, City of St. Louis, Removal and Replacement of Southwest and Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

Caddo Parish Commission·Louisiana

81% match

26-17, Mira Myrtis Road Bridge Replacement Project

Closes 11/12/2026Opened 10/21/2026

City of Charlotte·North Carolina

80% match

Bridge Repair Design

Rolling / TBD closeOpened 6/30/2028

U.S. Department Of Defense·Oregon

80% match

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Closes 10/29/2026Opened 7/6/2026

Georgia City of Winder·Georgia

80% match

RFQ# 2026-01 Jackson St. @ SR8 (May St.) - Pedestrian Bridge (PI#0021599)

Closes 11/19/2026Opened 10/12/2026

Massachusetts Department of Transportation·Massachusetts

80% match

607420 NATICK FAP No. HIP(NGB)-003S(965)X Bridge Replacement, N-03-012, Boden Lane over CSX/MBTA

Closes 10/27/2026Opened 9/8/2026

Cobb County, GA·Georgia

80% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Virginia Department of Transportation·Virginia

80% match

A98_2026 BRIDGE REPLACEMENT

Closes 11/18/2026Opened 9/9/2026

City of St. Louis·Missouri

80% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

Georgia Department of Transportation·Georgia

79% match

T32-D6-Bridge Drift SR2 Whitfield-193906

Closes 10/27/2026Opened 10/8/2026

Agency of Transportation - Contract Administration·Vermont

79% match

Topsham BF 031-1(13)

Closes 11/13/2026Opened 10/21/2026

Washington DC Transportation (DDOT)·District of Columbia

79% match

Rehabilitation/Reconstruction of 27th Street Bridge over Broad Branch Stream

Closes 11/2/2026Opened 9/24/2026

U.S. Department Of Defense·Oregon

79% match

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Closes 10/29/2026Opened 10/1/2026