The City of Chattahoochee Hills is seeking a qualified contractor to repair or replace the pedestrian bridge in Cochran Mill Park. The work is divided into four phases: mobilization & demolition, structural steel preparation & painting, bridge reconstruction with new decking and railings, and final cleanup. The contract is a sealed‑bid RFP with an optional pre‑proposal conference on Nov 5, 2026. Proposals are due by Nov 19, 2026 1 PM EST, with award expected Dec 3, 2026. The contract term is six months from notice to proceed.
• Scope includes demolition of existing bridge components, rust‑inhibitive primer and two finish coats, installation of pressure‑treated framing, decking, welded steel railings, and bollards.
• Required safety and environmental controls (temporary fencing, fall protection, debris containment).
• Contractor must provide at least three recent references, resumes, and a detailed work plan.
• Evaluation will consider cost (30‑40 pts), technical qualifications (25‑30 pts), schedule & approach (15‑20 pts), and safety/environmental controls (10‑15 pts).
• Contract value is not disclosed; typical bridge rehabilitation projects of this size range from $0.5 M to $1.5 M.