Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›STRUCTURAL REPAIRS AT NCMT BERTHS 24-3 AND 24-4, NATIONAL…

Port of San Diego·California

STRUCTURAL REPAIRS AT NCMT BERTHS 24-3 AND 24-4, NATIONAL CITY

Closes 11/4/2026$1.8M – $3.5MInvitation for Bid
Get bids like this by emailBid source

Description

The San Diego Unified Port District is seeking a qualified contractor to rehabilitate the concrete marginal wharf at National City Marine Terminal (NCMT) Berths 24‑3 and 24‑4. The scope includes demolition of existing deck and waterfront hardware, repair and jacking of piles, construction of a new reinforced‑concrete deck, replacement of bull rails, fenders, mooring hardware, and associated utility upgrades (potable water, storm‑water drainage, pavement, and conduit work). The project must comply with MARAD‑funded Buy America/Build America requirements, California prevailing‑wage rules, and a mandatory Project Labor Agreement. The contract is a fixed‑price, 470‑day effort estimated at $35.5 million, with an 8 % small‑business participation goal and extensive insurance, bonding, and certification requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jocelyne R. Rodriguez(Procurement Analyst II)

[email protected]

(619) 686-6396

Key dates

Opened
9/22/2026
Questions due
10/15/2026
Pre-bid meeting
9/30/2026
Site visit
10/1/2026
Closes
11/4/2026
Duration
470 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
2025-21

Budget estimate

$1,800,000 – $3,500,000

The solicitation lists an engineer’s construction estimate of $35,500,000. Assuming a typical contractor profit margin of 5‑10 % on a fixed‑price contract, the net earnings for the prime contractor would likely fall between roughly $1.8 M (5 %) and $3.5 M (10 %). Additional revenue could be earned from optional additive items (fender systems, extra pile repair) and from any approved change orders, potentially pushing the high end a bit higher.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Long Beach·California

Top match · 82%

R-7307 Alamitos Bay Berth 1 And 2 Dock Replacement

Closes 11/10/2026Opened 10/8/2026

City and County of San Francisco·California

81% match

EXT REC | CON26-0014 Marina Seawall - MLBE

Closes 12/31/2027Opened 1/16/2026

Town and County of Nantucket·Massachusetts

80% match

Town Pier Repairs & Improvements

Closes 10/29/2026Opened 9/16/2026

Massachusetts Town of Nantucket·Massachusetts

79% match

Nantucket Pier Repairs & Improvements

Closes 10/29/2026Opened 9/15/2026

City of Wilmington·North Carolina

79% match

DOCK STREET SHORELINE STABILIZATION

Closes 10/27/2026Opened 9/15/2026

City of Newport News·Virginia

79% match

Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/2/2026Opened 10/8/2026

City of Wilmington·North Carolina

79% match

DOCK STREET SHORELINE STABILIZATION

Closes 10/27/2026Opened 9/15/2026

Maryland Transportation Authority·Maryland

79% match

Demolition of Remaining FSK Bridge and Miscellaneous Marine Work

Closes 10/22/2026Opened 8/25/2026

City of Melbourne·Florida

79% match

Front Street Boat Dock Repair and Replacement

Closes 11/17/2026Opened 10/9/2026

North County Transit – San Diego Railroad·California

79% match

On Call Bus Stop Bench Replacement

Closes 11/10/2026Opened 10/8/2026

City of Key West·Florida

79% match

A-Dock Replacement and D-Dock Decking Replacement Key West Bight Marina

Closes 11/16/2026Opened 10/15/2026

City of San Diego·California

78% match

San Diego Convention Center West Roof Replacement

Closes 11/4/2026Opened 9/30/2026

City of Watsonville·California

78% match

Pinto Lake Dock Replacement Project

Closes 11/10/2026Opened 10/2/2026

City of Fort Myers·Florida

78% match

Derelict Vessel Removal Service Continuing Contract (Disaster)

Closes 11/10/2026Opened 7/16/2026

City of Newport News·Virginia

78% match

IFB# 27-2089-6256, Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/19/2026Opened 10/8/2026

California Department of Transportation·California

78% match

Clairemont drive bridge deck repair.

Closes 12/1/2026Opened 10/5/2026

New York City Department of Parks & Recreation·New York

78% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 10/16/2026

U.S. Department Of Defense·Pennsylvania

78% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026

New York City Department of Parks & Recreation·New York

78% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

Nyc Department of Parks and Recreation·New York

78% match

CNYG-223M Citywide Seawall Reconstruction

Closes 11/16/2026Opened 9/3/2026

Hawaii Department of Land and Natural Resources·Hawaii

78% match

Kikiaola Small Boat Harbor Hurricane Lowell Marg. Wharf Repair

Closes 10/30/2026Opened 10/14/2026

U.S. Department Of Defense·Pennsylvania

78% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/5/2026Opened 10/6/2026

City of San Diego·California

78% match

Murray Dam Near Term Repairs - Advertisement Notice Only (no bids)

Closes 12/1/2026Opened 10/6/2026

City of Hermosa Beach·California

78% match

CIP 623 - Pier Structural Repairs Project

Closes 11/12/2026Opened 10/15/2026

Jacksonville Port Authority·Florida

78% match

TALLEYRAND MARINE TERMINAL (TMT) PILE, CAP, AND BEAM REHAB

Closes 11/3/2026Opened 10/1/2026