Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Vermont guideVermont Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Vermont
  4. ›Closed bids
  5. ›AE Gale Meadows Pond Dam Rehabilitation Design

Department of Buildings and General Services VT·Vermont

AE Gale Meadows Pond Dam Rehabilitation Design

Closes 4/6/2026$2M – $5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State of Vermont’s Department of Buildings and General Services is seeking a qualified Architectural/Engineering firm to design, permit, and administer construction for the rehabilitation of the Gale Meadows Pond earth‑embankment dam. The scope covers data‑gap analysis, conceptual through final design, preparation of all required permits, bid‑package assembly, construction‑phase observation, and close‑out documentation, including an Engineer‑of‑Record statement and post‑fill inspections. The contract runs from May 2026 through July 2029 and includes a full‑time on‑site Resident Project Representative during construction. • Full‑service dam‑rehabilitation design (hydrologic/hydraulic, structural, geotechnical, concrete spillway, crest raise, energy‑dissipation). • Deliverables span from data‑gap memo to final, engineer‑stamped design sets, permit applications, bid documents, construction‑phase RPR services, and as‑built/close‑out reports. • Milestone‑based lump‑sum pricing required; mandatory electronic PDF submission ≤ 40 MB; all bidders must be Vermont‑registered and meet extensive certifications (anti‑collusion, climate‑change, Ukrainian solidarity, etc.).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

James Meyers(State Senior Purchasing Agent)

[email protected]

(802) 828-2211

Key dates

Opened
2/11/2026
Questions due
3/20/2026
Pre-bid meeting
3/11/2026
Closes
4/6/2026
Projected award
4/27/2026
Duration
3 years

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330

Budget estimate

$2,000,000 – $5,000,000

The RFP does not disclose a total contract value, but dam‑rehabilitation design projects of this size (≈ 300 ft embankment, concrete spillway, full permitting and construction administration) typically range from $2 million to $5 million in professional fees, depending on firm rates, staff levels, and optional services. The lower end assumes a modest design team and streamlined scope; the higher end reflects extensive sub‑consultant use, detailed permitting, and the 12‑week on‑site construction observation component.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation·Massachusetts

Top match · 69%

Bellevue Pond Dam Rehabilitation

Closes 10/29/2026Opened 9/16/2026

U.S. Department Of Defense·Kentucky

67% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

North Carolina City of Raleigh·North Carolina

67% match

Camp Pond Dam Reconstruction Project

Closes 11/5/2026Opened 9/22/2026

Village of Hoffman Estates·Illinois

65% match

Community Park Pond Restoration Project

Closes 10/14/2026Opened 9/21/2026

Massachusetts Town of Bolton·Massachusetts

65% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

65% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

Montgomery County OH·Ohio

65% match

Art Van Atta Park Pond Renovation and Dredging

Closes 10/21/2026Opened 10/2/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

65% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

Massachusetts Department of Conservation and Recreation·Massachusetts

64% match

DCR 931 Lakes & Ponds Design, Assessment and Management

Closes 5/30/2029Opened 3/11/2024

Virginia Tech·Virginia

64% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

City of North Charleston·South Carolina

64% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026

U.S. Department Of Defense·Kansas

64% match

Fall River Lake and Dam Damsite Park Lagoon Repair

Closes 10/20/2026Opened 9/30/2026

Virginia Polytechnic Institute and State University·Virginia

64% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

Minnesota Department of Natural Resources·Minnesota

64% match

Hinckley Area Office Rearing Ponds Water Supply

Closes 10/13/2026Opened 9/26/2026

City of Cumberland·Rhode Island

64% match

Rawson Pond Dam Spillway Replacement

Closes 10/13/2026Opened 9/21/2026

Waltham Housing Authority·Massachusetts

63% match

Water Service Replacement - Lower Pond

Closes 10/22/2026Opened 10/8/2026

City of Charlotte·North Carolina

63% match

Robert L. Smith Park Pond Surface Water Quality Improvement Project

Rolling / TBD closeOpened 5/29/2026

Laramie Rivers Conservation District·Wyoming

62% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Town of Cumberland·Rhode Island

62% match

Addendum #1: Rawson Pond Dam Spillway Replacement

Closes 10/13/2026Opened 10/3/2026

Town of Cumberland·Rhode Island

62% match

Addendum #2: Rawson Pond Dam Spillway Replacement

Closes 10/13/2026Opened 10/13/2026

Tampa-Hillsborough County Expressway Authority·Florida

62% match

P-0826 Parks Design Services

Closes 11/13/2026Opened 10/2/2026

City of Columbus·Ohio

62% match

Raymond Irrigation System Pond

Closes 10/20/2026Opened 9/29/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

62% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

U.S. Department Of Defense·Oklahoma

62% match

Fall River Lake and Dam Damsite Park Lagoon Repair

Closes 10/13/2026Opened 9/30/2026

U.S. Department Of The Interior·Colorado

62% match

CHOH 326202 Repair Historic Potomac River Dams 4 a

Closes 10/15/2026Opened 9/15/2026