The United States Department of Agriculture Forest Service is soliciting sealed bids for the complete reconstruction of the Grizzly Bear Campground in the Black Hills National Forest, South Dakota. The project includes demolition of existing pumphouse and water system, road realignment, installation of new water‑distribution and wastewater‑treatment infrastructure, construction of new utility buildings, site‑work for campsites, accessibility upgrades, and related site amenities. This is a total small‑business set‑aside commercial construction effort with a firm‑fixed‑price contract valued between $1 M and $5 M.
• Demolition of existing pumphouse, water system, and campground amenities.
• New road alignment, sub‑base enhancement, and site grading.
• Installation of a new underground water storage tank, upgraded water distribution network, sewage vaults, and a new stick‑built pump house and double‑toilet building.
• Comprehensive utility work (electrical, water, wastewater), signage, gates, and accessibility‑compliant campsite redesign.
• Requires extensive submittal package, monthly reporting, and compliance with historic preservation, environmental, and safety regulations.