The Washington County Natural Resources Department seeks a qualified contractor to upgrade Friess Lake access and associated park facilities to meet current ADA standards. The work includes demolition of existing roadway, parking lot, and concrete walkway; construction of a new asphalt roadway, permeable‑paver parking area, ADA‑compliant concrete walkway, stairway with railings, dock landing, rain‑garden bioretention basin, erosion control measures, landscaping, bollard lighting, and a pit toilet. The project must be substantially completed by May 28 2027, with final completion by September 30 2027, and no construction is permitted during June‑August 2027. All work must be left safe, fenced, and usable if not finished by the May deadline.
• Demolition of ~555 ft of existing road, parking, and concrete walkway.
• New asphalt road, permeable‑paver parking, ADA walkways, stairway, dock landing, lighting, and pit toilet.
• Environmental features: rain‑garden bioretention basin, erosion control, and landscaping.
• Mandatory pre‑bid site visit on October 15 2026; construction pause during summer 2027.