Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Missouri
  4. ›Closed bids
  5. ›Western Transmission Main Phase 2C - St. Charles County, MO

Public Water Supply District No. 2 of St. Charles County·Missouri

Western Transmission Main Phase 2C - St. Charles County, MO

Closes 3/31/2026$2M – $4MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Western Transmission Main Phase 2C is a water‑utility construction project that will extend a water main along Highway Z and Highway D in New Melle, Missouri. The contractor must install approximately 5,422 linear feet of 30‑inch ductile‑iron water main, 936 feet of 30‑inch restrained‑joint ductile‑iron water main, 192 feet of 36‑inch HDPE water main, and associated appurtenances, including connections to existing mains at both ends. The bid is sealed, with a 5 % bid bond required, and all work must comply with prevailing wage rates, Missouri immigration laws, and OSHA safety program requirements. • Install 5,422 LF of 30‑in. ductile‑iron water main and related fittings. • Install 936 LF of 30‑in. restrained‑joint ductile‑iron main and 192 LF of 36‑in. HDPE main. • Provide all necessary connections, appurtenances, and compliance with prevailing‑wage and OSHA regulations.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Richard McGhay(Director of Public Works)

[email protected]

(314) 354-7364

Key dates

Opened
2/24/2026
Questions due
3/23/2026
Pre-bid meeting
3/10/2026
Closes
3/31/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
20-003

Budget estimate

$2,000,000 – $4,000,000

The contract will likely be valued in the low‑ to mid‑multi‑million‑dollar range. Assuming an average installed cost of $350‑$600 per linear foot for large‑diameter ductile‑iron and HDPE pipe (material + labor + appurtenances), the 5,422 LF of 30‑in. DI alone could be $1.9‑$3.3 M. Adding the 936 LF of restrained‑joint DI, 192 LF of HDPE, and related fittings pushes the total to roughly $2.5‑$4.5 M. Therefore a reasonable estimate is $2 M at the low end to $4 M at the high end, with the final figure dependent on exact material prices, site conditions, and prevailing‑wage calculations.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Public Water Supply District No. 2 of St. Charles County·Missouri

Top match · 80%

Western Transmission Main Phase 3C - St. Charles County, MO

Closes 10/15/2026Opened 8/25/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

78% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Saint Charles·Missouri

68% match

4856 On-Call Utility Locate Services

Closes 10/23/2026Opened 9/17/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

67% match

WTP Pipe Gallery Replacement - St. Charles County, MO

Closes 11/18/2026Opened 10/1/2026

U.S. Department Of Defense·Missouri

66% match

Belle Fountain Ditch Cleanout Phase 2

Closes 10/27/2026Opened 10/13/2026

Charles County Government·Maryland

66% match

On-Call Maintenance, Repair and Upgrade of Utilities Infrastructure

Closes 11/18/2026Opened 10/6/2026

City of Santa Barbara·California

65% match

Transmission Main Renewal Phase 2

Closes 10/16/2026Opened 9/10/2026

Missouri Department of Conservation·Missouri

65% match

INVASIVE SPECIES MANAGEMENT

Closes 10/26/2026Opened 10/9/2026

City of Wentzville·Missouri

65% match

Interstate Drive/ Prospect Road Water Transmission Main

Closes 10/27/2026Opened 10/6/2026

U.S. Department Of Defense·Mississippi

64% match

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 7/22/2026

U.S. Department Of Defense·Missouri

64% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Maryland Frederick County Government·Maryland

64% match

IFB #27-121-CP Water Distribution Improvements Phase II

Closes 10/29/2026Opened 9/10/2026

County of Amherst·Virginia

64% match

Route 130 & 210 Water Line

Closes 11/19/2026Opened 9/28/2026

County of Frederick, MD·Maryland

64% match

Water Distribution Improvements Phase II

Closes 10/29/2026Opened 9/9/2026

Maryland Charles County Government·Maryland

64% match

ITB 27-009 NPDES Oak Ridge Park East Stream Restoration

Closes 10/20/2026Opened 9/18/2026

Facilities Management, Design, and Construction (Office of Administration)·Missouri

64% match

Walk-Through Weapons Detection System with an X-Ray Scanner Component

Closes 10/30/2026Opened 9/25/2026

Maryland Charles County Government·Maryland

64% match

ITB 27-005 On-Call Facilities Services-Trade, Mechanical & Fuel Tank Maintenance

Closes 10/14/2026Opened 9/18/2026

Maryland Charles County Government·Maryland

63% match

ITB 27-010 - Cobb Island and Hill Rd Sump Pump Station Improvements

Closes 10/22/2026Opened 10/2/2026

Missouri Department of Transportation·Missouri

63% match

St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue resurfacing, curb ramp upgrades, and traffic signal improvements

Closes 11/4/2026Opened 5/4/2026

St. Charles County·Missouri

63% match

26-032 RFQ Professional Services Pre-Qualification Architects Engineers and Land Surveyors

Closes 12/31/2027Opened 1/1/2026

Maryland Charles County Government·Maryland

63% match

ITB 27-008 On-Call Maintenance, Repair and Upgrade of Utilities Infrastructure

Closes 11/17/2026Opened 10/9/2026

City Utilities of Springfield·Missouri

63% match

Land Lease - Farm Road 112

Closes 10/16/2026Opened 9/25/2026

Maryland Charles County Government·Maryland

63% match

Stormwater Facilities Task Order Services

Closes 11/5/2026Opened 10/12/2026

Missouri Department of Conservation·Missouri

63% match

White Ranch Conservation Area TSI

Closes 10/22/2026Opened 10/9/2026

Maryland Calvert County Government·Maryland

63% match

RFP 2027-020 MULTI-MODAL CONNECTIVITY STUDY ST. MARY’S COUNTY, MARYLAND

Closes 10/22/2026Opened 9/26/2026