Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›BROADWAY CREEK RESTORATION - PHASE B

City of El Cajon·California

BROADWAY CREEK RESTORATION - PHASE B

Closes 11/16/2026$4.5M – $5.5MInvitation for Bid
Get bids like this by emailBid source

Description

The City of El Cajon is seeking a qualified contractor to perform the Phase B restoration of Broadway Creek, a 450‑foot earthen channel. The work includes demolition of existing concrete, earthwork, construction of soldier‑pile retaining walls, concrete structures, storm‑drain installation, temporary creek diversion, erosion and sediment control, landscaping, irrigation, paving, fencing, and utility relocation. The contractor must provide a 10 % bid bond, performance and labor‑material bonds equal to 100 % of the contract price, and meet extensive environmental, safety, and prevailing‑wage requirements. The project is funded in part by the San Diego River Conservancy and must be completed within 160 working days after the Notice to Proceed.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Mara Romano(Purchasing Agent)

[email protected]

(619) 441-1787

Key dates

Opened
10/14/2026
Questions due
10/30/2026
Closes
11/16/2026
Duration
160 Working Days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
010-27

Budget estimate

$4,500,000 – $5,500,000

The bid documents list an estimated contract value of $5.2 million. Assuming typical contractor margins of 8‑12 % on civil construction, the net earnings would likely fall between $4.5 million and $5.5 million. Factors influencing the range include the final scope of earthwork, material costs for concrete and steel, and any change orders during construction.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Santa Clara Valley Water District·California

Top match · 83%

COYOTE-ALAMITOS CANAL SHOTCRETE REPAIRS

Closes 11/10/2026Opened 10/13/2026

City of Colorado Springs·Colorado

82% match

Cottonwood Creek Stabilization Academy to Union

Closes 11/9/2026Opened 10/9/2026

California Department of Transportation·California

82% match

Drainage system restoration.

Closes 11/3/2026Opened 9/28/2026

Town of Camp Verde·Arizona

81% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Town of Los Gatos·California

81% match

709 University Avenue Drainage System Replacement Project

Closes 10/28/2026Opened 10/1/2026

City of Clearwater·Florida

81% match

Lower Spring Branch Stormwater Improvements

Closes 11/4/2026Opened 9/30/2026

Georgia City of Covington·Georgia

81% match

#2026-20 Pace Street Floodplain Restoration

Closes 10/20/2026Opened 8/17/2026

California Department of General Services·California

81% match

CONTRACT NUMBER: 26-336714; SITE COMPLIANCE AND IMPROVEMENTS ¿ PATTON LANDING CALIFORNIA TAHOE CONSERVANCY CARNELIAN BAY, PLACER COUNTY, CALIFORNIA; PROJECT NUMBER: 13891

Closes 11/10/2026Opened 10/2/2026

City of Fresno·California

80% match

Demolition of Existing Buildings at 1626 E Street

Closes 10/27/2026Opened 9/23/2026

Maryland Chevy Chase Village·Maryland

80% match

Belmont Ave.Extended (Buffer) Drainage Project

Closes 10/20/2026Opened 9/30/2026

City of American Canyon·California

80% match

Green Island Road Class I Project

Closes 10/22/2026Opened 9/17/2026

U.S. Department Of Defense·Tennessee

80% match

Belle Fountain Ditch Cleanout Phase 2

Closes 10/20/2026Opened 9/3/2026

U.S. Department Of Defense·Puerto Rico

80% match

RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO

Closes 10/27/2026Opened 10/14/2026

Texas Williamson County·Texas

80% match

Brushy Creek Trail Retaining Wall

Closes 11/23/2026Opened 10/12/2026

Montrose County·Colorado

80% match

2026 B-117 Spring Creek Road Bridge Replacement

Closes 10/22/2026Opened 9/30/2026

City of Santa Barbara·California

80% match

Transmission Main Renewal Phase 2

Closes 10/23/2026Opened 9/10/2026

Nevada Government·Nevada

80% match

Carson City Centennial Park Drainage Project

Closes 10/21/2026Opened 9/30/2026

California Highway Patrol·California

80% match

Water Conservation Landscape Services - IFB 26C330002

Closes 10/28/2026Opened 9/9/2026

City of Austin·Texas

80% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

City of Port Arthur·Texas

80% match

PORT ARTHUR ECONOMIC DEVELOPMENT CORPORATION (EDC) SPUR 93 AND JADE AVENUE BUSINESS PARK LANDSCAPE AND IRRIGATION MAINTENANCE

Closes 10/23/2026Opened 10/12/2026

California Department of Transportation·California

80% match

Construct bridge, roadway, streambed, delineation, remove culvert.

Closes 10/28/2026Opened 9/21/2026

The City of Pacifica·California

80% match

Headworks Rehabilitation and Improvement Project - Phase 1A

Closes 11/4/2026Opened 10/14/2026

Massachusetts City of Newburyport·Massachusetts

80% match

IFB No. 27-13: Hale Street Drainage Project

Closes 10/28/2026Opened 10/14/2026

U.S. Department Of Defense·California

80% match

USACE SPK DBB Construction - LAR C3B North - Sacramento, CA

Closes 10/20/2026Opened 10/2/2026

U.S. Department Of Defense·Missouri

80% match

Levee Repairs at Saline County Levee District #2, Ray-Carroll Bottoms Consolidated Levee District of Carroll County, and Howard County Levee District #4

Closes 2/5/2027Opened 11/26/2025