The U.S. Coast Guard is soliciting a commercial contractor to perform a comprehensive dryâdock availability on the 45âfoot RBâM cutter (Hull #45665) stationed at Coast Guard Station Cape May, NJ for FY 2027. The work includes general welding, ultrasonic testing, hull plating inspection, fender repair, diesel fuel tank cleaning and inspection, alignment of main diesel engines to generators and waterâjet drives, waterâjet inspection, anode renewal, electrical isolation, fuel tank defueling/refueling, preservation of nonâskid pads, marine chemist services, provision of temporary services, seaâtrial support, and preservation of the lazarette bilge. The contract period of performance is 06 Jan 2027 â 04 Feb 2027 (â30 days). The contractor must comply with multiple Surface Forces Logistics Center (SFLC) specifications, Coast Guard drawings, and federal safety/environmental regulations, provide fireâwatch personnel, maintain environmental protection plans, and submit required inspection reports (CIRs) and fireâsafety plans. All work is to be performed at the Coast Guard facility; the government will provide certain drawings, technical publications, and some governmentâfurnished property, while the contractor supplies all equipment, labor, and consumables.
⢠Dryâdock repairs for a 45âft aluminum cutter (RBâM) â hull, propulsion, fuel, and ancillary systems.
⢠20 detailed work items covering welding, NDE, mechanical alignment, corrosion control, preservation, and seaâtrial support.
⢠Must follow SFLC Specs 0000, 0740, 5550, 6310, 8634, 8635 and applicable CFRâ29 safety rules.
⢠Contractor provides fireâwatch, environmental manager, temporary services, shore power, and required permits.
⢠Period of performance: 06 Jan 2027 to 04 Feb 2027 (â30 days).