Description
The State of Vermont is seeking a qualified A/E firm to provide complete design, permitting, bid‑package preparation, and construction‑administration services for the rehabilitation of the Gale Meadows Pond earth‑embankment dam. The effort is divided into nine clearly defined milestones ranging from data‑gap analysis through final design, permit acquisition, construction‑phase observation, and close‑out documentation. The contract runs from mid‑2026 through mid‑2029 and includes a one‑year warranty period.
• Full‑service dam‑rehabilitation design (hydrologic/hydraulic, structural, geotechnical, concrete spillway, crest raise).
• Preparation and submission of all required federal, state, and local permits on behalf of the dam owner.
• Construction‑phase services including an on‑site Resident Project Representative for up to 12 weeks and post‑construction close‑out deliverables.
• Mandatory electronic‑only submission; all deliverables must be provided in PDF and AutoCAD DWG formats.
• Evaluation based on team strength, approach, price, and references; award expected late‑April 2026.
Attached files
The solicitation documents live at the source — open the bid source above to download them.