The Kemper County Board of Supervisors is seeking sealed bids for the design‑build construction of approximately 0.179 miles of bridge and associated roadway approaches on Old Jackson Road (State Aid Program Project SAP‑35(77)). The work includes demolition of existing bridge structures, extensive earthwork, placement of granular and asphalt pavement, installation of concrete pipe, guardrails, traffic control devices, and erosion control measures. The contract will be awarded to the lowest qualified bidder and must be completed within 110 working days. Bidders must submit a certified bid bond equal to 5 % of the total bid and may obtain plans and specifications for a non‑refundable fee of $50 each.
• Scope includes mobilization, clearing, bridge removal, pipe removal, excavation, fill, granular base, asphalt paving (12.5 mm & 19 mm), concrete pipe, guardrails, signage, striping, and erosion control.
• Separate “Bridge A” and “Bridge B” item lists detail precast concrete elements, piles, caps, and riprap.
• All work must comply with the Mississippi Standard Specifications for State Aid Road and Bridge Construction.
• Submission deadline: 10:00 a.m., September 30, 2026 at the Kemper County Courthouse, DeKalb, MS.
• Required bid bond: 5 % of total bid, payable to Kemper County and the State of Mississippi.
• Plans and contract documents available from Engineering Plus (Meridian, MS) for $50 each.