Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›MT PRAIRIE 2016(3), Milwaukee Bridge Resurfacing and Rehabilitation
More bids in Washington →

U.S. Department Of Transportation·Washington

MT PRAIRIE 2016(3), Milwaukee Bridge Resurfacing and Rehabilitation

Closes 8/6/2026$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the resurfacing and rehabilitation of the Milwaukee Bridge in Prairie County, Montana. The contractor will be required to perform the work in accordance with the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. The project includes new specifications for prosecution and progress, and for schedules for construction contracts. The contractor will be required to use the Government's web-based system Masterworks to prepare all "Inspector's Daily Record of Construction Operations" and measurement notes. The contractor will also be required to provide a tank truck or trailer with a minimum of 300 gallons of water during yarding, loading, land clearing, right-of-way clearing, and mechanical treatment of slash. • The project requires compliance with State Forest Laws and fire prevention and suppression equipment. • The contractor must provide adequate two-way communication facilities to report fires to the Contracting Officer and/or Fire Official. • The contractor must obtain the predicted fire stage daily before starting work from Montana Fish, Wildlife & Parks. • The contractor must follow all state and local fire restrictions. • The contractor must provide a fire security person who shall perform fire security services on the project area and vicinity. • The contractor must provide firefighting tools in a readily accessible fire tool box or compartment. • The contractor must provide a long-handled round point shovel and a five-gallon backpack pump with water during blasting operations.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Contracts G. Office(Contracts)

[email protected]

(360) 619-7520

Key dates

Opened
1/29/2026
Closes
8/6/2026
Duration
6 months

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
69056726B000003

Budget estimate

$1,000,000 – $5,000,000

Based on the project's scope, which includes resurfacing and rehabilitation of a bridge, the budget is estimated to be in the range of $1 million to $5 million. This estimate is based on the assumption that the project will require significant construction work, including the use of heavy machinery and specialized labor. The final budget will depend on the contractor's bid and the government's evaluation of the bid.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Transportation·Washington

Top match · 72%

WY NP YELL 15(3), Madison River Bridge Interim Repair

Closes 5/2/2027Opened 5/2/2025

City of Indianapolis·Indiana

70% match

BM-16-505 38th Street (ED & WB) over Little Eagle Creek Rehabilitation

Closes 10/15/2026Opened 9/18/2026

Missoula County·Montana

70% match

Lolo Street Bridge Replacement Bid Set with Bridge Plans & Water Main Plans IFB, Geotechnical Report, Beau Geste Addition Lot 1 TCE, Orrsdale No. 3 Lots 1 $ 3 Slope Easement, 318 Permit Authorization

Closes 10/14/2026Opened 9/17/2026

U.S. Department Of Transportation·Washington

70% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/2/2026

Arkansas State Game and Fish Commission·Arkansas

70% match

CR 316 Bridge Reinforcing Project – Bridge Structure #1 & #10, Lawrence County, Arkansas

Closes 11/5/2026Opened 10/4/2026

City of Eden Prairie·Minnesota

70% match

Flying Cloud Trail Improvements

Closes 10/29/2026Opened 10/9/2026

Massachusetts Department of Transportation·Massachusetts

69% match

612193 ANDOVER FAP No. HIP(NGB)-0934(003) Bridge Preservation, A-09-022, I-93 over Merrimack River

Closes 11/3/2026Opened 8/24/2026

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Mississippi

69% match

Bridge Replacement & Approaches on Moon Lake Road – Project No. ERBR‑SAP‑14(83) (0.161 mi)

Closes 10/20/2026Opened 9/30/2026

U.S. Department Of The Interior·Colorado

69% match

YELL 338223 - Bridge Preservation

Closes 10/30/2026Opened 4/24/2026

Carver County·Minnesota

69% match

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

City of Madison·Wisconsin

69% match

Milwaukee St Recon

Closes 11/5/2026Opened 11/5/2026

U.S. Department Of The Interior·Wyoming

69% match

Z--YELL 338223 - Bridge Preservation

Closes 10/30/2026Opened 10/7/2026

Coahoma County Board of Supervisors·Mississippi

69% match

Coahoma County Board of Supervisors; Moon Lake Road Bridge & Approaches ERBR-SAP-14(83) Project

Closes 10/20/2026Opened 9/29/2026

U.S. Department Of Transportation·Mississippi

69% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 10/20/2026Opened 10/8/2026

Connecticut Dept. of Transportation·Connecticut

69% match

Rehabilitation of Bridge No. 02150 in the Town of Stratford

Closes 10/28/2026Opened 9/30/2026

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Connecticut Dept. of Transportation·Connecticut

69% match

Rehabilitation of Bridge No. 02150 in the Town of Stratford

Closes 10/28/2026Opened 9/30/2026

City of Indianapolis·Indiana

69% match

BM-16-505 38th Street (ED & WB) over Little Eagle Creek Rehabilitation

Closes 10/15/2026Opened 9/18/2026

NYS Wayne County·New York

69% match

Hawley Road (CR 170) Over Red Creek Bridge replacement

Closes 10/22/2026Opened 9/18/2026

Illinois THA - Toll Highway Authority·Illinois

68% match

EMERGENCY NOTICE - Bridge Repairs, I-88, MP 121.9 (Canadian National Railway)

Closes 12/2/2026Opened 9/8/2026

Georgia Rockdale County Board of Commissioners·Georgia

68% match

REBID Haralson Mill Rd. Covered Bridge Rehabilitation

Closes 11/5/2026Opened 9/30/2026

Oregon Department of Transportation·Oregon

68% match

ODOT McKenzie Bridge Maintenance Station Roof Replacement

Closes 10/20/2026Opened 9/21/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

68% match

DOT&PF Notice of Public Open House: Klondike Highway Rehabilitation: Skagway River Bridge to Black Lake

Rolling / TBD closeOpened 9/15/2026

Alaska Department of Transportation and Public Facilities·Alaska

68% match

NOTICE OF FLOOD ENCROACHMENT & INTENT TO BEGIN ENGINEERING AND ENVIRONMENTAL STUDIES: Moose Creek Bridge and Moose Creek

Closes 10/23/2026Opened 9/24/2026