The Wyoming State Construction Department, on behalf of the Wyoming Department of Corrections, is seeking qualified architectural/engineering firms to provide full design and engineering services for the replacement of three high‑efficiency condensing boilers at the Wyoming Women’s Center in Lusk, WY. The work includes field investigations, load calculations, security and environmental protocols, detailed mechanical, electrical, and architectural design, construction documents, permitting, and construction‑administration support through commissioning. Firms must submit a Statement of Qualifications (SOQ) via the Public Purchase system by the September 24, 2026 deadline.
• Replace two commercial boilers at the correctional facility and one light‑commercial boiler at the Warden’s Residence with Patterson‑Kelley condensing units.
• Phase 1: Site assessments, load verification, security & insulation abatement planning.
• Phase 2: Mechanical piping, venting, gas sizing, electrical upgrades, BAS integration, architectural clearances, structural pads.
• Phase 3: Produce stamped construction drawings, specifications, and obtain required permits.
• Phase 4: Construction administration, review submittals, conduct commissioning and training.
• Only SOQs submitted on State of Wyoming forms through Public Purchase will be considered.