The U.S. Army Corps of Engineers Savannah District is conducting market research for an Optimized Remediation Contract (ORC) to address environmental remediation at 26 Installation Restoration Program sites and 1 Military Munitions Response Program site across Moody AFB and Robins AFB in Georgia. The effort will involve investigation, design, construction, operation, maintenance, and optimization of remedial systems, with a focus on reducing lifeâcycle costs and accelerating site closure. Contractors will be expected to provide comprehensive project management, quality assurance, reporting, community outreach, and coordination with multiple regulators (GA EPD, EPA). The contract will be performanceâbased, with a period of performance likely spanning up to ten years, and will require a full suite of engineering, environmental, and construction capabilities.
⢠Scope: Fullâcycle environmental remediation (investigation, design, construction, O&M, optimization) for 27 sites.
⢠Locations: Moody Air Force Base and Robins Air Force Base, Georgia.
⢠Required expertise: RCRA/CERCLA compliance, hazardous waste handling, PFAS analysis, remedial system design, performanceâbased contracting, community involvement planning.
⢠Deliverables: Project Management Plans, Integrated Master Schedules, Quality Program Plans, Performance Models, Reduce LifeâCycle Cost plans, regular reporting (CAP progress, monitoring data), and final closeâout documentation.
⢠Contract type: Performanceâbased, likely IDIQ with multiple task orders; award will be based on demonstrated capability and past performance.