The Town of Moretown is soliciting bids from qualified bridge contractors to design, supply, install, and later remove a temporary 95‑foot, one‑lane bridge over the Mad River while the existing concrete bridge is reconstructed. The temporary structure must include paved approach roads and remain in service from December 1 2026 through October 31 2027 to maintain resident and emergency‑vehicle access. Bids are due electronically by 11:00 AM on September 15 2026; all questions must be submitted in writing by September 8 2026.
• Scope: Fabrication, delivery, installation, and removal of a 95‑ft temporary bridge with paved approaches.
• Location: Intersection of Hooper Lane and Lovers Lane Road, Route 100B, Moretown, VT (44.300084° N, 72.698448° W).
• Duration: Approximately 11 months of service (12/1/26 – 10/31/27).
• Funding: FEMA‑funded project.
• Submission: Email bids to town clerk ([email protected]); questions to Rae Washburn ([email protected]).
• Estimated Value: Not listed; typical temporary bridge projects of this size range from $150‑$500 k.