Description
The City of Port St. Lucie’s Utility Systems Department is seeking a non‑competitive, sole‑source contract to supply and replace Liberty Cutter commercial grinder pumps for its wastewater treatment facilities. PSI Technologies, Inc. is the exclusive municipal distributor for Liberty Pumps in Southeast Florida, making it the only qualified vendor. The contract will span three years with two optional one‑year renewals and an annual spend of approximately $400,000. The pumps are required to replace failing equipment in the city’s 381‑wastewater grinder system, ensuring continued operation of critical water‑treatment infrastructure.
• Product: Liberty Cutter submersible grinder pumps (models LGV023M‑3 and LGV022M‑3) with accessories.
• Quantity/Scope: Ongoing supply for a multi‑year contract; exact unit counts not disclosed.
• Funding: Local municipal funds; no state, federal, or other funding identified.
• Vendor justification: PSI Technologies is the sole authorized municipal distributor for the Liberty Pumps line in the designated counties.
• Contract value: $400,000 per year, total ~ $1.2 M over three years, with two one‑year renewal options.
• No competitive bidding, pre‑bid meeting, or site‑visit requirements.
Attached files
The solicitation documents live at the source — open the bid source above to download them.