Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›MSD Infrastructure Repairs Phase 2

U.S. Department Of Defense·Missouri

MSD Infrastructure Repairs Phase 2

Closes 9/24/2027$1.3M – $4MInvitation for Bid
Get bids like this by emailBid source

Description

The U.S. Army Corps of Engineers, St. Louis District, is seeking a contractor to perform sewer rehabilitation using Cured‑In‑Place Pipe (CIPP) for the Metropolitan St. Louis Sewer District. The work covers approximately 2,675 linear feet of combined sewer lines ranging from 21‑ to 24‑inch diameter, located within the MSD boundaries in St. Louis City and County, Missouri. The contractor must supply all labor, equipment, supervision, materials, and incidentals required to complete the CIPP installation. This is a federal construction assistance contract with a fixed‑price scope. • Scope: CIPP rehabilitation of ~2,675 ft of combined sewers (21‑24 in. diameter). • Location: St. Louis, MO (MSD Service Area 1). • Requirements: Provide all labor, equipment, supervision, supplies, and materials; comply with MSD specifications. • Contract type: Invitation for Bid (IFB) under solicitation W912P926BA009. • Point of contact: Catherine Hansen (USACE).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Catherine Hansen

[email protected]

Key dates

Opened
9/24/2026
Closes
9/24/2027

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
W912P926BA009

Budget estimate

$1,300,000 – $4,000,000

Based on industry cost data for CIPP sewer rehabilitation (approximately $500‑$1,500 per linear foot), the 2,675 ft scope translates to an estimated contract value between roughly $1.3 million and $4.0 million. The lower end assumes a simple install with minimal access challenges; the higher end accounts for complex site conditions, higher material costs, and extensive supervision.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Missouri

Top match · 96%

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of Walterboro·South Carolina

85% match

Middle Ireland Creek Sewer Trunk Line Rehabilitation

Closes 10/27/2026Opened 9/25/2026

City of Fort Wayne·Indiana

85% match

77635 - 2026 CIPP Pkg 1 Small and Medium Diameter

Closes 11/5/2026Opened 10/16/2026

City of Bellevue·Washington

85% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

Georgia Brunswick‑Glynn County Joint Water and Sewer Commission·Georgia

84% match

ITB No. 27-006 Construction Services for Basin 4001 and 4013 CIPP Rehabilitation

Closes 11/10/2026Opened 10/7/2026

City of Wheaton·Illinois

84% match

City of Wheaton 2026 Sewer Main Rehabilitation Project

Closes 10/26/2026Opened 10/9/2026

U.S. Department Of Defense·Indiana

84% match

Section 219 Chesterton Interceptor Rehab

Closes 10/15/2027Opened 10/15/2026

City of Independence·Missouri

84% match

2024 Neighborhood Sanitary Sewer CIP Project No. 302004-2

Closes 11/4/2026Opened 10/7/2026

City of Braintree·Massachusetts

84% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026

Gateway Services Community Development District·Florida

83% match

Sanitary Sewer Rehabilitation

Closes 10/21/2026Opened 9/18/2026

City of Fairfield·Ohio

83% match

2026 Storm Sewer Rehabilitation via PVC Lining

Closes 10/26/2026Opened 10/9/2026

City of Albany·Georgia

83% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

St. Bernard Parish Government·Louisiana

83% match

Daniel Drive Sewer Repairs and Rehabilitation, St. Bernard Parish Government

Closes 10/20/2026Opened 9/21/2026

City of Seattle·Washington

83% match

Spot Sewer Rehabilitation Unit Price Contract 6

Closes 11/4/2026Opened 10/7/2026

City of Fresno·California

83% match

Sewer Rehabilitation in Clinton, Fruit, McKinley, and West Avenues

Closes 10/27/2026Opened 9/29/2026

City of Portsmouth·Virginia

83% match

RFP#332-27-YE PIPE REHABILITATION SERVICES

Closes 10/19/2026Opened 9/8/2026

U.S. Department Of Defense·Tennessee

83% match

Belle Fountain Ditch Cleanout Phase 2

Closes 10/20/2026Opened 9/3/2026

Orange County Sanitation District, CA·California

83% match

3-60 (Construction), Knott-Miller Holder Artesia Branch Rehabilitation

Closes 11/16/2026Opened 9/29/2026

City of Wheaton·Illinois

83% match

City of Wheaton Sewer Main Rehabilitation PRoject

Closes 10/26/2026Opened 10/9/2026

U.S. Department Of Defense·Missouri

82% match

Missouri Valley Levee Repairs

Closes 1/20/2027Opened 1/20/2026

City of New York Department of Design and Construction·New York

82% match

85027B0001 - EC-SEQN27 RECONSTRUCTION OF EXISTING SEWERS, NORTH QUEENS

Closes 10/22/2026Opened 9/17/2026

City of American Canyon·California

82% match

2026 Sewer Rehabilitation Project

Closes 1/12/2027Opened 9/17/2026

City of Moline·Illinois

82% match

CHS-H-47-51 JACOBSEN - 1002 53rd street Moline, IL

Closes 10/28/2026Opened 10/14/2026

City of Mansfield·Ohio

82% match

2026 Sanitary Sewer Inflow and Infiltration Reduction Project

Closes 10/27/2026Opened 10/9/2026

Connecticut Town of Fairfield·Connecticut

82% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026