Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alabama guideAlabama Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Alabama
  4. ›Closed bids
  5. ›Solicitation: 26000000013 Corridor Study Tenn. River Bridge Project…

Alabama Department of Transportation·Alabama

Solicitation: 26000000013 Corridor Study Tenn. River Bridge Project Decatur to I-65

Closes 8/28/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Alabama Department of Transportation is seeking a professional engineering firm to conduct a comprehensive corridor study for the Tennessee River Bridge project spanning Decatur to Interstate 65. The study will cover the three counties along the corridor, examining right‑of‑way, environmental impacts, preliminary design, and related engineering tasks, with the possibility of supplemental agreements for expanded scope. • Scope includes engineering and environmental studies, field surveys, right‑of‑way plans, tract sketches, deeds, and preliminary bridge design. • Single‑unit contract (quantity = 1) with a bid window from August 7 to August 28 2026. • Must be registered on Alabama Buys, enrolled in E‑Verify, and certify compliance with state tax and debarment requirements. • Primary point of contact is the buyer, Darren Scott.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Darren Scott(Buyer)

[email protected]

(334) 242-6623

Key dates

Opened
8/7/2026
Closes
8/28/2026

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
RFP - 012 - 26000000013

Budget estimate

$500,000 – $2,000,000

No contract amount is disclosed. A corridor study of this magnitude for a major river bridge typically ranges from a few hundred thousand to a few million dollars, depending on the depth of analysis and deliverables. Based on comparable statewide bridge studies, a reasonable ball‑park estimate is $0.5 million – $2 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Rogers·Arkansas

Top match · 74%

REQUEST FOR LETTERS OF INTEREST - US-71B CORRIDOR STUDY AND RAILYARD LOOP TRAIL UNDERCROSSING STUDY

Closes 11/3/2026Opened 10/13/2026

City of Rogers·Arkansas

74% match

SS4A US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies Request for Letters of Interest

Closes 11/3/2026Opened 10/11/2026

City of Rogers·Arkansas

74% match

Request for Letters of Interest – US‑71B Corridor Study & Railyard Loop Trail Undercrossing Feasibility Studies

Closes 11/3/2026Opened 10/11/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 4-2025 (OM25004)

Closes 3/23/2027Opened 2/4/2025

Georgia Department of Transportation·Georgia

73% match

NTC-484-101626

Closes 10/16/2026Opened 9/18/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 6-2025 (OM25006)

Closes 3/23/2027Opened 3/26/2025

Georgia Cobb County Department of Transportation·Georgia

73% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

U.S. Department Of Defense·Louisiana

73% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Arkansas

72% match

Bayou Meto Canal 1000 Phase 4.2

Closes 10/30/2026Opened 9/30/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 2-2025 (OM25002)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 10-2025 (OM25010)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 9-2026 (OM26009)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 7-2025 (OM25007)

Closes 3/23/2027Opened 3/25/2025

U.S. Department Of Defense·Tennessee

72% match

Bayou Meto Canal 1000 Phase 4.2

Closes 10/30/2026Opened 9/30/2026

U.S. Department Of Defense·Illinois

72% match

Sources Sought/Request for Information Upper Mississippi River Restoration (UMRR) – Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1

Closes 10/26/2026Opened 9/22/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 8-2026 (OM26008)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

Kansas Turnpike Authority·Kansas

72% match

KTA 8171 – I‑70 Widening in Douglas and Leavenworth Counties

Closes 10/13/2026Opened 9/1/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 3-2026 (OM26003)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

72% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 10-2026 (OM26010)

Closes 5/7/2028Opened 4/15/2026

Simpson County Board of Supervisors·Mississippi

72% match

LSBP-64(27) - Highway 472

Closes 10/16/2026Opened 9/17/2026