Description
The City of Ames is seeking proposals from qualified firms to provide electrical engineering services for an Arc Flash Study for several critical facilities for the Water and Pollution Control Department. The scope of work includes a physical walkthrough of the facilities, system analysis, preparation of technical specifications and drawings, arc flash labeling, and training services. The selected firm will be responsible for ensuring compliance with all OSHA regulations, NFPA 70 standards, IEEE 1584-2018 standards, and industry safe standards. The project is expected to last approximately 90 days, with a tentative project schedule provided.
• The City of Ames is seeking a firm to provide electrical engineering services for an Arc Flash Study.
• The study will be conducted at four facilities in Ames, including the Water Treatment Plant and three pump stations.
• The scope of work includes a physical walkthrough, system analysis, preparation of technical specifications and drawings, arc flash labeling, and training services.
• The selected firm will be responsible for ensuring compliance with all OSHA regulations, NFPA 70 standards, IEEE 1584-2018 standards, and industry safe standards.
• The project is expected to last approximately 90 days, with a tentative project schedule provided.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
Amanda Moore(Procurement Specialist II)