The Lone Star College System (LSCS) is issuing a Competitive Sealed Proposal (CSP) to construct new public water mains (12âinch and 8âinch), a private 8âinch fire service line, a fireârated water meter vault, an RPZ backflow preventer, and an aerobic septic system with dripâirrigation disposal field at the Kingwood campus. The contractor must provide all labor, materials, equipment, permits, testing, inspections, and closeâout services, adhering to City of Houston standards, Texas regulations, and AWWA specifications. The scope includes excavation, trenchless crossing, surface restoration, traffic control, and documentation. The project budget is approximately $500,000, with a submission deadline of 9/25/2026.
⢠Construct 12âin. and 8âin. PVC water mains along Kingwood Drive and Sorters Road.
⢠Install private 8âin. fire service line, fireârated meter vault, and RPZ backflow assembly on campus.
⢠Build an aerobic septic system with dripâirrigation disposal field.
⢠Provide all appurtenances, valves, fire hydrants, testing, disinfection, and commissioning.
⢠Perform excavation, shoring, bedding, backfill, and full surface restoration to preâconstruction conditions.
⢠Manage traffic control, SWPPP, permits, and closeâout documentation.