The City of Lincoln Fire & Rescue Department is seeking qualified contractors to complete earthwork, reinforced‑concrete foundation, slab, and site restoration for a new modular fire‑training tower at the LFR training facility (300 South Street, Lincoln, NE). The contractor must handle all aspects of subgrade preparation, concrete placement, staking, surveying, permitting, coordination with the tower installer, and final site cleanup, while adhering to strict geotechnical, PFAS handling, and frost‑depth requirements. Substantial completion of the foundation is required by December 10 2026, with the contract awarded on a firm‑fixed‑price basis to the lowest responsible and responsive bid.
• Scope includes excavation, backfill evaluation, compaction, reinforced concrete foundation and slab (minimum 4,000 psi 28‑day strength)
• Required surveying, staking, and final as‑built survey for tower installer verification
• Coordination with City, project geotechnical engineer, and WHP tower installer
• Permit acquisition (fees reimbursed) and compliance with PFAS disposal regulations
• Restoration of disturbed paving, grading, and site cleanup to ready the site for tower delivery
• Performance and payment bond required; no payment for incomplete work