Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Kansas guideKansas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Kansas
  4. ›Civil Engineering
  5. ›Newton Plum Street Bridge Rehabilitation Design

City of Newton·Kansas

Newton Plum Street Bridge Rehabilitation Design

Closes 11/3/2026$50k – $150kInvitation for Bid
Get bids like this by emailBid source

Description

The City of Newton is seeking bids for the design and construction of rehabilitation work on the Plum Street Bridge over Slate Creek. The scope includes concrete surface repairs, epoxy crack treatments, waterproofing of substructure elements, and an optional alternate timber bridge at the Sand Creek Station Golf Course. This is a straightforward civil engineering/bridge repair contract focused on structural rehabilitation rather than new construction. • 245 sf concrete surface repair, 10 lf epoxy resin crack repair, and 46 sy waterproofing membrane on the existing bridge. • Optional alternate work: timber bridge replacement at Sand Creek within a golf course setting. • All bids must be submitted to the City of Newton by 1:30 PM on 11 Nov 2026; plans and specifications are available only to registered users.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Will Pyles

[email protected]

(316) 262-2691

Key dates

Opened
10/14/2026
Closes
11/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
541330
Solicitation №
257044-016

Budget estimate

$50,000 – $150,000

The contract is for a modest bridge rehabilitation design package plus optional timber bridge work. Based on typical rates for engineering design ($100‑$150 per hour) and an estimated 400–800 total engineering hours, the budget would likely fall between $50,000 and $150,000. The lower end reflects a minimal design scope, while the higher end includes the optional timber bridge component and any additional consulting.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

South Indian River Water Control District·Florida

Top match · 82%

SIRWCD Bridge Repair

Closes 10/22/2026Opened 9/23/2026

City of High Point·North Carolina

82% match

Bid 09-110426 Bridges Preservation Project

Closes 11/4/2026Opened 10/2/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

81% match

Pell Bridge Rehabilitation

Closes 11/2/2026Opened 9/1/2026

Town of Pulaski·Virginia

81% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

City of Charlotte·North Carolina

81% match

Bridge Repair Design

Rolling / TBD closeOpened 6/30/2028

City of Cedar Rapids·Iowa

81% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Somerset County·New Jersey

81% match

REHABILITATION OF COUNTY BRIDGE NO. F0807 DAVENPORT STREET OVER PETERS BROOK, BOROUGH OF SOMERVILLE, SOMERSET COUNTY, NEW JERSEY

Closes 11/5/2026Opened 10/14/2026

City of Cedar Rapids·Iowa

81% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

MTA - NYC Transit (NYCT)·New York

81% match

Rehabilitation of Queens Boulevard Bridge

Closes 10/21/2026Opened 9/8/2026

MTA - NYC Transit (NYCT)·New York

81% match

PMC HHM 407 Bridge Preservation Henry Hudson Bridge and HHM 408 Misc. Cleaning and Concrete Repairs Dyckman St Bridge

Closes 11/20/2026Opened 10/2/2026

Missouri Department of Transportation·Missouri

81% match

SW District, City of Carthage, Replacement of bridge on 3rd Street

Closes 10/20/2026Opened 9/17/2026

Massachusetts City of Taunton·Massachusetts

80% match

Design Services for Danforth Street Bridge

Closes 11/12/2026Opened 10/14/2026

Montrose County·Colorado

80% match

2026 B-117 Spring Creek Road Bridge Replacement

Closes 10/22/2026Opened 9/30/2026

City of Cedar Rapids·Iowa

80% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Massachusetts Department of Transportation·Massachusetts

80% match

612874 SHREWSBURY-WORCESTER Bridge Preservation, S-14-021=W-44-115, I-290 (EB and WB) over Lake Qu

Closes 10/27/2026Opened 8/31/2026

City of Fremont·Ohio

80% match

Tiffin Street Bridge Replacement Project

Rolling / TBD closeOpened 9/29/2026

Carver County·Minnesota

80% match

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

Massachusetts Department of Transportation·Massachusetts

80% match

605323 OXFORD FAP No. HIP(NGB)-004S(015)X Bridge Replacement, O-06-030, (ST 56) Leicester Road ov

Closes 10/20/2026Opened 9/21/2026

Massachusetts Department of Transportation·Massachusetts

80% match

609068 SHEFFIELD FAP No. STP(BR-OFF)-003S(993)X Bridge Replacement, S-10-015, Kelsey Road over Sch

Closes 10/20/2026Opened 9/8/2026

Missouri Department of Transportation·Missouri

80% match

SW District, City of Carthage, 3rd Street Bridge over Spring River Tributary

Closes 10/20/2026Opened 9/16/2026

City of Charlotte·North Carolina

80% match

Bridge Repairs

Rolling / TBD closeOpened 1/1/2027

Washington DC Transportation (DDOT)·District of Columbia

80% match

Rehabilitation/Reconstruction of 27th Street Bridge over Broad Branch Stream

Closes 10/26/2026Opened 9/24/2026

Connecticut Town of Cheshire·Connecticut

80% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Village of Schaumburg·Illinois

80% match

Salt Creek Improvements

Closes 10/23/2026Opened 10/2/2026

City of Lebanon·New Hampshire

80% match

Lebanon 24222 NH Route 120 (Hanover Street) Bridge Rehabilitation

Closes 10/22/2026Opened 9/25/2026