Description
This opportunity concerns the rehabilitation of the wet well at the U.S. 13 East Pump Station (Station #7). The scope includes mobilization/demobilization, a temporary sanitary sewer bypass, and the full wet‑well lining and restoration. Three vendors were quoted, with a combined contract value of $475,300. The project was cancelled, and no timeline, award, or further procedural dates are provided.
• Scope: Mobilization, sewer bypass, wet‑well liner installation, and post‑work restoration.
• Budget: $475,300 total across three lump‑sum line items.
• Vendors: Abel Recon (owner), Advanced Rehabilitation Tech, JJID, Inc. – each providing a single lump‑sum service.
• Location: Pump station on U.S. Route 13, likely within Pennsylvania (owner based in Mountville, PA).
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
(717) 285-3103