Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Wyoming
  4. ›Closed bids
  5. ›Francs Fork Off Channel Stock Watering Pipeline - Wyoming Game & Fi…

Wyoming State Construction Department·Wyoming

Francs Fork Off Channel Stock Watering Pipeline - Wyoming Game & Fish Department

Closes 5/28/2026$150k – $500kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Wyoming State Construction Department is seeking bids for the construction of the Francs Fork Off Channel Stock Watering Pipeline in Park County, Wyoming. The project involves the installation of a stock watering pipeline, extending from an existing watering tank and ending where a new tank will be installed at a later date. The pipeline will include fittings, valves, a flushing valve, and miscellaneous work associated with installation. A mandatory pre-bid meeting will be held on May 7, 2026. Key aspects of the project include: • Installation of a 1.5-inch HDPE pipeline • Construction of air valve and pressure switch pits • Provision of valves, fittings, and other miscellaneous materials • Compliance with Wyoming Prevailing Wage Act of 1967 • Warranty requirements for defective work • Preference for resident bidders and Wyoming-made materials

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lenora Simpson(Procurement Representative)

[email protected]

(307) 777-3558

Key dates

Opened
4/16/2026
Questions due
5/15/2026
Pre-bid meeting
5/7/2026Mandatory
Closes
5/28/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
26-0636

Budget estimate

$150,000 – $500,000

The budget for this project can be estimated based on the scope of work, which includes the installation of a stock watering pipeline, construction of air valve and pressure switch pits, and provision of valves, fittings, and other miscellaneous materials. Considering the materials and labor required for the project, a rough estimate for the budget could be between $150,000 and $500,000. However, this is a rough estimate and the actual budget may vary depending on various factors, including the complexity of the project, the number of bidders, and the final bid price.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Trout Unlimited·Wyoming

Top match · 69%

South Fork Ditch Creek Fish Passage Project

Closes 10/30/2026Opened 10/9/2026

University of Wyoming·Wyoming

67% match

UW Beef Unit Waterline Installation

Closes 10/20/2026Opened 9/28/2026

Wyoming State Construction Department·Wyoming

67% match

Vault Restrooms within the Salt River Public Access Areas - Wyoming Game & Fish Dept.

Closes 10/29/2026Opened 9/23/2026

Wyoming State Construction Department·Wyoming

65% match

Vault Restrooms within the Platte Valley Public Access Areas - Wyoming Game & Fish Dept.

Closes 10/23/2026Opened 9/16/2026

Laramie Rivers Conservation District·Wyoming

64% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

U.S. Department Of Defense·Georgia

64% match

Notice of intent to sole source

Closes 10/19/2026Opened 10/5/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

64% match

Western Transmission Main Phase 3C - St. Charles County, MO

Closes 10/15/2026Opened 8/25/2026

U.S. Department Of Agriculture·Wyoming

64% match

4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming

Closes 10/27/2026Opened 9/30/2026

Department of Natural Resources (Georgia)·Georgia

63% match

Trout Feed

Closes 10/15/2026Opened 9/15/2026

Confederated Tribes of the Colville Reservation·Washington

63% match

F&W Anadromous Fisheries Division, Salmon Creek RM8 Fish log procurement

Closes 11/19/2026Opened 10/14/2026

Wyoming Department of Transportation·Wyoming

63% match

2026 CRAIG WL-0600 12’ HYDRAULIC REVERSIBLE PLOW

Closes 11/3/2026Opened 10/13/2026

Florida Fish and Wildlife Conservation Commission (FWC)·Florida

63% match

Dinner Island Ranch WMA Canal Cleaning and Maintenance

Closes 10/16/2026Opened 9/18/2026

U.S. Department Of The Interior·New Mexico

63% match

Y--NGWSP Cutter Lateral Reach 21 Booster Plant

Closes 10/30/2026Opened 9/30/2026

County of Sacramento·California

63% match

Gibson Ranch Park Water Well Monitoring

Closes 10/30/2026Opened 10/2/2026

U.S. Department Of The Interior·Colorado

63% match

Y--GRAY WALL LIVESTOCK WATER WELL

Closes 10/26/2026Opened 8/25/2026

Georgia Department of Natural Resources·Georgia

63% match

Trout Feed

Closes 10/14/2026Opened 9/15/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

63% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of Agriculture·Wyoming

63% match

Big Springs Horse Corral Replacement

Closes 10/29/2026Opened 9/24/2026

California Grants·California

63% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

City of Billings·Montana

63% match

W.O. 26-08: WRF Digester Gas Pipe Replacement

Closes 11/4/2026Opened 10/1/2026

City of Santa Monica·California

63% match

Santa Monica Groundwater Basin Monitoring Program

Closes 10/26/2026Opened 9/28/2026

U.S. DOC NOAA - ERA Production·United States of America

62% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024