Description
The City of Cedar Rapids Public Works is seeking qualified contractors to relocate interior vault utilities located in the basement of the Town Centre building at 316 2nd Street SE. The work is part of a larger vault and sidewalk repair project, with an engineer‑estimated cost of $75,000. The contract will commence upon receipt of a Notice to Proceed and must be completed by 12/31/2026. Bidders must attend one of two mandatory pre‑bid conferences (9/17/2026 or 9/23/2026) to be considered responsive. Submissions are due by 11:00 AM on 9/30/2026. The scope includes removal, re‑routing, and reinstalling of existing utility lines within the vault space, complying with City of Cedar Rapids specifications and state‑wide construction standards.
• Relocation of electrical, plumbing, and related utility systems in a confined underground vault.
• Must follow City of Cedar Rapids SUDAS specifications and applicable federal, state, and local regulations.
• Contractor responsible for all labor, materials, permits, inspections, and safety compliance.
• Estimated project value $75,000; final payment based on actual quantities performed.
• Mandatory pre‑bid attendance; bid bond and required certifications must be submitted.
Attached files
The solicitation documents live at the source — open the bid source above to download them.