This contract covers a full roof replacement for the Snow Avenue Pump Station (208 Snow Avenue, Loves Park, IL 61111). The work includes removal of the existing roof, installation of an architectural shingle roofing system with under‑layment and ice‑and‑water shield, rehabilitation of inset gutters, removal/replacement of plaster soffit, painting of soffit, replacement of a static “box” vent, and contingency repair of damaged sheathing. The project is funded by the Four Rivers Sanitation Authority and was awarded through a competitive bidding process. Key contractual requirements include OSHA, ADA, prevailing‑wage compliance, extensive insurance and bonding, and a liquidated‑damage clause of $300 per day for any delay past the October 31 2025 completion date.
• Scope: Architectural shingle roof, gutter rehab, plaster soffit repair & paint, vent replacement, sheathing repair.
• Schedule: Work must be completed by 31 Oct 2025; bid opening 19 Aug 2025.
• Financials: Low‑bid total $92,824.27 (≈ $86,352.50 unit price); 10 % bid bond, 100 % performance bond required.