This solicitation calls for a full roof removal and replacement on the K‑9 Academy Training Facility (Building A) owned by Taylor Public Schools. The project covers approximately 11,550 sq ft of roof, requiring demolition of the existing built‑up asphalt membrane, deck inspection/repair, installation of new pressure‑treated wood nailers, sheet‑metal flashing, and a cold‑applied built‑up asphalt roofing system with associated drainage and flashings. Work must be coordinated with ongoing school operations, limited to normal business hours, and include extensive site protection, temporary roofing, waste disposal, and compliance with EPA and local regulations. Unit‑price pricing is required for deck material replacement, drain bolt replacement, roof drain replacement, clamping rings, and wood nailer replacement. The contractor must provide pre‑installation conferences, submit product data, shop drawings, and quality‑assurance documentation, and must maintain the site in a safe, clean condition throughout.
• Roof area: 11,550 sq ft, slope 1:12
• Scope: full tear‑off, deck repair/replacement, new BUR system (cold‑applied)
• Required deliverables: unit‑price schedule, product data, shop drawings, warranties, maintenance manuals
• Site constraints: school occupied, limited access, 7 am‑5 pm weekdays, 72‑hour notice for disruptive activities
• Compliance: EPA notifications, hazardous‑material handling, dust/odor control, OSHA safety requirements
• Contact: Shevawn Dushane‑Masland (buyer)