This contract concerns the 2018‑1 Culvert Replacement project for Snohomish County, Washington, encompassing the removal, excavation, and installation of multiple culverts, associated roadway grading, paving, drainage, and erosion‑control work. Five contractors submitted formal sealed bids, with totals ranging from roughly $555 k to $1.17 M; the engineer’s estimate for the entire scope is near $2 M. The solicitation was opened on 20 Mar 2018 and awarded on 28 Mar 2018, but the winning vendor is not identified in the available files.
• Scope: excavation, culvert installation, HMA & cold‑mix paving, drainage, grading, erosion‑control, traffic‑control, and site cleanup.
• Bid totals: ERRG Inc. $1.17 M, Thomco Const. $0.80 M, Award Construction $0.65 M, Matía Contractors $0.56 M, plus an unnamed fifth bidder.
• Engineer’s estimate: approximately $1.95 M, indicating the project’s magnitude and budgetary expectations.