This contract involves the demolition of existing structures at 1203 Oak Lane Circle West in Mobile, Alabama, as part of a nuisance‑abatement effort. The work includes wet demolition, utility line capping, comprehensive debris removal, erosion and sediment control, site stabilization, and compliance with lead‑based‑paint and asbestos regulations, culminating in a published final‑completion notice.
• Wet demolition of all structures, footings, and slabs with field verification.
• Cap and disconnect water, sewer, and gas utilities; provide documentation to the municipal enforcement department.
• Implement erosion‑control BMPs, seed, top‑soil, and mulch for permanent site stabilization, and handle hazardous waste disposal per NESHAP requirements.
• Deliver before‑and‑after photos, waste shipment records, and a newspaper notice of final completion; all work must be completed within 30 calendar days of the Notice to Proceed.