Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Connecticut
  4. ›Closed bids
  5. ›Long Hill Connector (9% SBE)

Awarded contract·The Metropolitan District·Connecticut

Long Hill Connector (9% SBE)

$750kAwarded 5/5/2020Single Award
Contract source

Description

This contract concerns the design‑build installation of a water transmission main and associated connection points along a bridge abutment in South Windsor, CT. The scope includes all labor, equipment, permits, and related accessories needed to lay new water mains, tie‑in to existing infrastructure, and complete the necessary testing and commissioning. Bidders were required to hold a 10 % bid security and possess current DAS Contractor Pre‑qualification Certificates for water and sewer work, with additional certification required for any subcontractor whose portion exceeds $500,000. A mandatory pre‑bid conference was held on 30 January 2020, and all questions were to be submitted by 6 February 2020. The Metropolitan District will act as the owner and will administer the contract after award. • Scope: Installation of new water transmission mains and bridge‑abutment connections. • Requirements: DAS pre‑qualification, 10 % bid security, mandatory pre‑bid conference attendance. • Timeline: Bids due 21 Feb 2020; award announced 5 May 2020.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
2/21/2020
Intent to award
5/5/2020
Awarded
5/5/2020

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
2020B-06

Set-asides

Small Business, Partial Set-Aside

Contract value

$750,000

The solicitation does not disclose a contract value. Typical municipal water‑main installations of comparable length (a few hundred feet) and complexity in Connecticut range from $400,000 to $1 million, depending on material, trench depth, and site constraints. Considering the requirement for bridge‑abutment work and the presence of a 10 % bid security, a reasonable midpoint estimate would be around $750,000. This figure assumes standard HDPE or ductile‑iron pipe, typical labor rates, and includes contingency for permitting and testing.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Defense·United States of America

Top match · 62%

59--CONNECTOR,PLUG,ELECTRI

Closes 10/18/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

60% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/20/2026Opened 10/6/2026

City of Springfield·Illinois

60% match

Transmission Line Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

60% match

59--CONNECTOR,RECEPTACLE,E

Closes 10/22/2026Opened 10/12/2026

U.S. Department Of Defense·United States of America

59% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

59--ADAPTER,CONNECTOR

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

59--CONNECTOR,RECEPTACLE,E

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·Ohio

59% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/14/2026Opened 9/29/2026

Texas Department of Transportation·Texas

59% match

STATE LET MAINTENANCE CONTRACT, HILL CO, TRAFFIC CONTROL SERVICES

Closes 11/4/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

59% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/22/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

59% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

59--CONNECTOR,RECEPTACLE,E

Closes 10/21/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

59% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·Ohio

58% match

59--ADAPTER,CONNECTOR

Closes 10/16/2026Opened 10/1/2026

Village of Schaumburg·Illinois

58% match

Salt Creek Improvements

Closes 10/23/2026Opened 10/2/2026

U.S. Department Of Defense·United States of America

58% match

59--CONNECTOR ASSEMBLY,ELE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

58% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

58% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

58% match

59--CONNECTOR,PLUG,ELECTRI

Closes 10/20/2026Opened 10/6/2026