Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Closed bids
  5. ›Citywide Catch Basin Connector Pipe Screen (CPS) Installation Project

Awarded contract·City of Azusa·California

Citywide Catch Basin Connector Pipe Screen (CPS) Installation Project

Won by United Storm Water, Inc.$458kSingle Award
Contract source

Awarded vendors

  • United Storm Water, Inc.

Description

The City of Azusa is set to award a construction contract for the installation of Catch Basin Connector Pipe Screen (CPS) inserts throughout its storm‑water system. United Storm Water, Inc. is the selected vendor, with a base bid amount of $457,976. The notice serves as a pre‑award notification, allowing any interested party a five‑working‑day window to file objections. No additional procedural details, performance bonds, or renewal provisions are included. • Scope: Install CPS inserts city‑wide in existing catch basins to improve storm‑water flow and debris filtration. • Value: Fixed‑price contract valued at $457,976, indicating a small‑to‑medium municipal project. • Process: Notice of Intent to Award posted on Sept 10 2026; objections must be submitted within five working days. • Contact: Christina Curiel (Public Works Project Manager) – [email protected].

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Sole Source
Industry
Water Management and Sanitation
NAICS
237110

Contract value

$457,976

The notice explicitly lists a “Total Base Bid Amount” of $457,976.00, which represents the contract’s fixed price to the awardee. Since no other costs (e.g., change orders, contingencies) are mentioned, the best estimate of the contract’s monetary value is the stated base bid amount.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Corona·California

Top match · 68%

Citywide Storm Drain Catch Basin Filters Phase II

Closes 10/14/2026Opened 9/14/2026

Minnesota Department of Administration·Minnesota

66% match

Storm Sewer Lining/Sealing – Elgin, MN C-Store

Closes 10/23/2026Opened 9/30/2026

Town of Westwood·Massachusetts

66% match

Catch Basin Cleaning

Rolling / TBD closeOpened 9/9/2026

Town of Kershaw·South Carolina

66% match

Lynches River Waterline Bore

Closes 10/22/2026Opened 9/25/2026

City of Columbus Ohio·Ohio

66% match

Blueprint Miller‑Kelton Newton/Bedford Lateral Lining Project 1

Closes 10/14/2026Opened 9/16/2026

City of Columbus Ohio·Ohio

66% match

Parsons Avenue Water Plant – CW112 Raw Water Line (Invitation for Bid)

Closes 11/4/2026Opened 10/6/2026

City of Cleveland·Ohio

65% match

North Coast Connector

Closes 12/30/2026Opened 10/1/2026

City of Portsmouth·Virginia

65% match

RFP#332-27-YE PIPE REHABILITATION SERVICES

Closes 10/19/2026Opened 9/8/2026

Connecticut Town of Stratford·Connecticut

65% match

Diversion Chamber C Inlet Pipe Modifications -WPCF

Closes 10/16/2026Opened 9/17/2026

Long Beach Utilities Department·California

65% match

Cherry Avenue Sewer Improvement Project (SC-0512)

Closes 10/14/2026Opened 9/18/2026

City of Charlotte·North Carolina

65% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

Connecticut Town of Stratford·Connecticut

65% match

Diversion Chamber C Inlet Pipe Modifications -WPCF

Closes 10/16/2026Opened 9/17/2026

City of Wheaton·Illinois

65% match

City of Wheaton Sewer Main Rehabilitation PRoject

Closes 10/26/2026Opened 10/9/2026

The City of Columbus·Ohio

65% match

RFQ033812 - PAWP Wellfield Development

Closes 11/4/2026Opened 10/7/2026

North Little Rock Wastewater·Arkansas

65% match

Faulkner Lake Bar Screen Installation Project

Closes 10/28/2026Opened 8/23/2026

New York City Department of Environmental Protection·New York

64% match

82626B0065-BEDC - CSO-GC-SFS-OH-CP3 Construction of CSO Facilities for Gowanus Canal

Closes 11/17/2026Opened 9/30/2026

City of Wauchula·Florida

64% match

HEARD BRIDGE WATER MAIN LOOP

Closes 10/16/2026Opened 9/16/2026

City of Wheaton·Illinois

64% match

City of Wheaton 2026 Sewer Main Rehabilitation Project

Closes 10/26/2026Opened 10/9/2026

Mississippi

64% match

2026 Citywide Sewer CIPP Project

Closes 10/14/2026Opened 10/5/2026

City of Columbus·Ohio

64% match

Blueprint Miller Kelton Newton Bedford Lateral Lining (65087

Closes 10/14/2026Opened 9/15/2026

Long Beach Utilities Department·California

64% match

Construction Management & Inspection Services - Cherry Avenue Sewer Improvement Project (SC-0512)

Closes 10/29/2026Opened 9/28/2026

California Department of Transportation·California

64% match

Construct DPP infiltration areas, capture housing, bioswales, & MVPs.

Closes 11/10/2026Opened 9/28/2026

City of Mansfield·Ohio

64% match

2026 Sanitary Sewer Inflow and Infiltration Reduction Project

Closes 10/27/2026Opened 10/9/2026

City of Farmers Branch·Texas

64% match

2026 Water and Wastewater - Capital Improvements Plan - Phase #1

Closes 10/29/2026Opened 10/7/2026

City of Opa-locka·Florida

64% match

Pump Station 11-C Bypass Control

Closes 10/30/2026Opened 9/25/2026