Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alaska guideAlaska Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Alaska
  4. ›Closed bids
  5. ›Etolin Street & Medical Campus Utilities Assistance Project

Awarded contract·City and Borough of Wrangell·Alaska

Etolin Street & Medical Campus Utilities Assistance Project

Won by Ketchikan Ready Mix & Quarry, Inc.$1.1MSingle Award
Contract source

Awarded vendors

  • Ketchikan Ready Mix & Quarry, Inc.

Description

This municipal contract covers the design‑build of utility infrastructure along Etolin Street and the City‑run medical campus in Wrangell, Alaska. The scope includes a gravel road, storm‑water drainage, culverts, water‑main installation, subdivision force‑main, a clinic pump station, and related electrical coordination. The awarded contractor, Ketchikan Ready Mix & Quarry, Inc., is responsible for civil excavation, pipe installation (HDPE water and force‑mains), lift‑station equipment, and compliance with U.S. Army Corps of Engineers wetland permits. Key points: • Contract value roughly $1.14 million (engineer’s estimate ≈ $1.5 million). • Completion deadline set for May 15 2012, with liquidated damages for delays. • Required 5 % bid bond, performance and payment bonds, and extensive prevailing‑wage and certified‑payroll compliance. • Multiple addenda introduced technical changes to lift‑station check valves, flow meters, and overhead power‑supply coordination.

Attached files

Key dates

Bids closed
1/16/2012
Contract modified
1/13/2012
Ends
5/15/2012

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110

Contract value

$1,150,000

The award summary cites a contract cost of $1,139,200, while the engineer’s estimate in the solicitation is about $1.5 million. Considering typical municipal contingency allowances and the fact that the lowest bid matched the quoted $1,139,200 figure, a reasonable ball‑park for the final contract value is roughly $1.15 million. This estimate assumes the awarded contractor will execute the full scope (road, drainage, water and sewer utilities, lift‑station equipment) without major change orders.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Radford University·Virginia

Top match · 67%

IFB - IMPROVE CAMPUS UTILITIES INFRASTRUCTURE - ELECTRICAL

Closes 10/15/2026Opened 9/15/2026

City of Fort Myers·Florida

66% match

Michigan Avenue Utility Improvement Project

Closes 10/26/2026Opened 9/24/2026

San Jacinto College·Texas

65% match

CSP 27-01 Electrical Upgrades, Buildings C30, C31, C32

Closes 10/14/2026Opened 9/16/2026

City of Indianapolis·Indiana

65% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

San Jacinto Community College District·Texas

65% match

CSP #27-01 Electrical Upgrades, Buildings C30, C31, C32

Closes 10/14/2026Opened 9/16/2026

City of Sylvania, OH·Ohio

65% match

Monroe Street Lighting Improvements (Harroun Road to Acres Road)

Closes 11/3/2026Opened 10/12/2026

City of Broken Arrow·Oklahoma

64% match

Oak Creek South Concrete Street Rehabilitation

Closes 10/27/2026Opened 9/29/2026

City of Charlotte·North Carolina

64% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Trident Technical College·South Carolina

64% match

Berkeley Campus Vet Tech Generator

Closes 10/14/2026Opened 9/21/2026

NYS State University Construction Fund·New York

64% match

Reconstruct Water Distribution System - Ellicott Quad

Closes 10/14/2026Opened 9/15/2026

Lansing Board of Water & Light·Michigan

64% match

Utility Network Project

Closes 10/21/2026Opened 9/16/2026

Texas San Jacinto College District·Texas

64% match

CSP #27-01 Electrical Upgrades, Buildings C30, C31, C32

Closes 10/14/2026Opened 9/16/2026

San Jacinto College·Texas

64% match

CSP 27-01 Electrical Upgrades, Buildings C30, C31, C32

Closes 10/14/2026Opened 9/16/2026

U.S. Department Of Veterans Affairs·Indiana

64% match

Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution.

Closes 10/23/2026Opened 10/7/2026

East Bay Municipal Utility District·California

64% match

Power Generation System Master Plan Project

Closes 10/16/2026Opened 9/8/2026

Medical University of South Carolina·South Carolina

63% match

Generator Repair and Maintenance

Closes 10/22/2026Opened 9/14/2026

City of Charlotte·North Carolina

63% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

City of Mason·Ohio

63% match

East Main Parking Lot - Electrical/Lighting Project

Closes 10/27/2026Opened 10/6/2026

City of Charlotte·North Carolina

63% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

City of Lake Oswego·Oregon

63% match

Ash Street and Lund Street – Storm System Improvements Project

Closes 10/29/2026Opened 9/29/2026

City of Charlotte·North Carolina

63% match

Fiscal Year 2026 Street Main Extensions Contract 1

Rolling / TBD closeOpened 1/15/2026

City of Gallup·New Mexico

63% match

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/5/2026Opened 7/24/2026

City of Roseville·California

63% match

Design-Assist Construction of Pleasant Grove Wastewater Treatment Plant Electrical Power System Capacity Expansion Project

Closes 10/28/2026Opened 9/2/2026

City of Charlotte·North Carolina

63% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Pasadena·California

63% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026