Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Michigan
  4. ›Closed bids
  5. ›​Multi-lane Road Reconfiguration Evaluation

Awarded contract·City of Ann Arbor·Michigan

​Multi-lane Road Reconfiguration Evaluation

Won by Toole Design$300kSingle Award
Contract source

Awarded vendors

  • Toole Design

Description

This contract concerns a professional evaluation of a multi‑lane road reconfiguration. The issuing agency (A2Gov) sought proposals to assess design alternatives, traffic impacts, safety considerations, and cost implications for a proposed roadway modification. The work likely involves traffic engineering analysis, feasibility studies, and a final recommendation report. • Scope includes traffic flow modeling, safety analysis, and cost‑benefit evaluation for the reconfiguration. • The RFP was due on January 15, 2025, and the award is tentatively slated for Toole Design pending council approval. • No detailed financial, start‑date, or duration information is disclosed in the available documents.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Questions due
12/16/2024
Bids closed
1/15/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Solicitation
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
RFP 25-03​

Contract value

$300,000

The RFP does not disclose a contract value. Typical engineering evaluation services for a multi‑lane road reconfiguration (including traffic modeling, safety analysis, and a final report) range from $150,000 to $500,000 depending on project complexity, geographic location, and consultant rates. Given the scope described and the fact that the award is tentative pending council approval, a reasonable midpoint estimate is approximately $300,000.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

We’re still matching open opportunities to this contract — check back soon.