Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Closed bids
  5. ›Mono Lake ADA Boardwalk Materials

Awarded contract·California Department of Parks and Recreation·California

Mono Lake ADA Boardwalk Materials

Won by Wagners CFT LLC$500kAwarded 7/2/2026Single Award
Contract source

Awarded vendors

  • Wagners CFT LLC

Description

This contract concerns the supply of all material components needed to construct a new ADA‑compliant boardwalk at Mono Lake, California. The agency is procuring a complete prefabricated deck system—including FRP composite decking, stainless‑steel brackets, rivets, hardware, and related structural steel members—subject to strict color (RAL 080‑30‑26 Smoked Oak) and environmental requirements. The award is a firm‑fixed‑price, “all‑or‑none” goods contract with a 90‑day delivery window after order receipt. • 740 ft of 6‑ft‑wide boardwalk, fabricated from fiber‑reinforced polymer (FRP) mini‑mesh decking panels (48″ × 72″ × 1.5″) with a two‑part fluoropolymer coating. • 185 decking panels, 2,200 decking clips, and a full suite of stainless‑steel brackets, rivets, and end caps to connect the deck to existing concrete Diamond Pier foundations. • Warranty requirement of a minimum five‑year OEM warranty, recycled‑content certification for applicable items, and compliance with California’s socio‑economic preference programs.

Attached files

Key dates

Questions due
6/23/2026
Bids closed
7/9/2026
Intent to award
7/2/2026
Awarded
7/2/2026
Contract modified
7/2/2026
Starts
6/16/2026
Ends
7/9/2026
Duration
23 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Solicitation
Invitation for Bid
Industry
Manufacturing
NAICS
327215
Solicitation №
0000039497

Contract value

$500,000

The bill‑of‑materials spreadsheet lists 185 FRP decking panels, several hundred steel joists, brackets, rivets, and ancillary hardware. Assuming an average cost of $200 per FRP panel ($37,000), $150 per steel joist/bracket assembly (≈150 units → $22,500), $5 per rivet (≈9,500 rivets → $47,500), and $10 per decking clip (2,200 clips → $22,000), the material subtotal is roughly $130,000. Adding engineering, coating, freight (FOB destination), warranty extensions, and a modest contractor markup (≈30 %) brings the total to about $170,000. However, the agency’s preference ceiling (up to $100 k) and typical state procurement thresholds suggest the final award will likely fall in the $300‑$500 k range to accommodate ancillary costs, taxes, and contingency. Therefore a reasonable ball‑park estimate is **$500,000**.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Ottawa, Kansas·Kansas

Top match · 63%

Lakeside Estates Shared Use Path - Ottawa, KS

Closes 10/20/2026Opened 9/28/2026

City of Madison·Wisconsin

63% match

Madison LakeWay – Skyline Improvements (Contract 9801)

Closes 12/17/2026Opened 10/1/2026

California Department of Transportation·California

62% match

ADA curb ramps, high tension cable barrier, and LED lighting.

Closes 11/5/2026Opened 9/21/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

61% match

Heavy duty roll up beach access mat.

Closes 10/20/2026Opened 9/28/2026

City of Rancho Cordova·California

61% match

2026 ADA Sidewalk Improvement Project

Closes 10/21/2026Opened 9/30/2026

County of Collier, FL·Florida

61% match

Freedom Park Boardwalk Repairs - Boardwalks 1 & 2

Closes 11/6/2026Opened 10/6/2026

City of Dania Beach·Florida

60% match

Sidewalk Rehabilitation Phase II

Closes 10/19/2026Opened 9/18/2026

U.S. Department Of Transportation·Idaho

60% match

ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road

Closes 10/20/2026Opened 9/28/2026

Washington County, WI·Wisconsin

60% match

Glacier Hills Co Park Friess Lake Access Project

Closes 11/5/2026Opened 10/7/2026

LA Public Works Engineering Bureau·California

60% match

SIDEWALK REPAIR PROGRAM PACKAGE NO. 89 (LA 28)

Closes 10/14/2026Opened 9/9/2026

Glynn County·Georgia

60% match

East Beach Massengale Park Boardwalk

Closes 11/4/2026Opened 10/6/2026

City of Ormond Beach - Purchasing Office·Florida

60% match

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026

City of Ormond Beach - Purchasing Office·Florida

60% match

Main Trail Bridge Repair

Closes 11/2/2026Opened 9/27/2026

City of Destin·Florida

60% match

Boardwalk Repair, Replacement, and Maintenance

Closes 10/15/2026Opened 9/23/2026

Indiana Natural Resources·Indiana

59% match

Used Dredge Mats for Ferdinand/Pike SF 159255

Closes 11/3/2026Opened 10/1/2026

City of Rancho Cordova·California

59% match

OPEN 2026 ADA Sidewalk Improvement Project

Closes 10/21/2026Opened 9/30/2026

City of Panama City Beach·Florida

59% match

CRA Front Beach Road Segment 4.1 Design-Build

Closes 10/22/2026Opened 7/28/2026

City of Norfolk·Virginia

59% match

Virginia Zoo - Africa Boardwalk Repairs

Closes 11/12/2026Opened 9/21/2026

Alaska Department of Transportation & Public Facilities·Alaska

59% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

Miami-Dade County·Florida

59% match

Olympic Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026

Iowa State University·Iowa

59% match

CP1248808-Lake LaVerne-Improvements-Bridge and Amphitheater

Closes 10/29/2026Opened 10/1/2026

Florida City of Miami Beach·Florida

59% match

PREQUALIFICATION POOL OF CONTRACTORS TO PROVIDE GENERAL AND EMERGENCY LANDSCAPE

Closes 9/13/2027Opened 4/7/2025

Environmental Conservation, NYS Department of·New York

59% match

Eighth Lake Campground Roadway, Water and Electrical System Improvements

Closes 10/28/2026Opened 9/29/2026

State University of New York (SUNY)·New York

59% match

ADA Curb Ramps

Closes 10/27/2026Opened 10/1/2026

Coahoma County Board of Supervisors·Mississippi

58% match

Coahoma County Board of Supervisors; Moon Lake Road Bridge & Approaches ERBR-SAP-14(83) Project

Closes 10/20/2026Opened 9/29/2026