The City of Rapid City is seeking bids for the Meade Street Water Reconstruction project, which involves replacing approximately 1,300 lineal feet of water main. The project includes the replacement of the existing 6-inch water main, which has reached the end of its useful life. The bid results show that Simon Contractors, Lidel Construction, and Underground Construction submitted bids, with Simon Contractors being the highest bidder at $806,677.00. The engineer's estimate for the project is $830,219.00. The project is advertised with an authority of $740,000.00.
• The project includes the replacement of approximately 1,300 lineal feet of water main.
• The existing 6-inch water main has reached the end of its useful life.
• The bid results show that Simon Contractors, Lidel Construction, and Underground Construction submitted bids.
• The engineer's estimate for the project is $830,219.00.
• The project is advertised with an authority of $740,000.00.