The contract is for the reconstruction of the southwest water booster pump station located at Corral Drive and Sheridan Lake Road. The new water booster pump station will be constructed at the northeast corner of Sheridan Lake Road and Springbook Road. The project has an advertising authority of $5,300,000.00 and the engineer's estimate is $5,298,770.00. The contract was awarded to RCS Construction with a base bid of $4,153,598.00.
• The project involves the reconstruction of a water booster pump station.
• The new station will be constructed at a different location than the existing one.
• The project has a significant budget, with an advertising authority of over $5 million.
• The contract was awarded to RCS Construction, with a base bid of over $4 million.