This contract is a sealed‑bid competitive procurement by Snohomish County for a single truck‑mounted liquid‑asphalt distributor (Bearcat BC502 or equal). The County supplied a Peterbilt 320 cab‑and‑chassis; the contractor must provide the distributor body, integrate it, deliver, install, and provide warranty, parts support, and on‑site training. The award went to EDECO Southwest Service Co. dba BearCat Manufacturing as the lowest responsible bidder.
• Equipment: Bearcat BC502/CRC liquid‑asphalt distributor, 1,750‑gal insulated tank, full‑circulating spray bar, hydraulic pump, computerized controls, and hand‑spray system.
• Delivery: ≤ 120 days after receipt of cab & chassis; includes installation, post‑delivery inspection (~30 days), and a 12‑month warranty.
• Contractor obligations: Provide 2 days of on‑site training, maintain OEM parts inventory with 0 % discount, and comply with all technical specifications listed in the ITB.