Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Closed bids
  5. ›North Flagler Dr Stormwater Drainage and Water Main Improvements REBID

Awarded contract·City of West Palm Beach·Florida

North Flagler Dr Stormwater Drainage and Water Main Improvements REBID

$3MSingle Award
Contract source

Description

The City of West Palm Beach is awarding a construction contract for the design‑build installation of new stormwater drainage systems and water main upgrades along North Flagler Drive. The work is funded by a Florida Department of Environmental Protection grant (#22SRP61) and must comply with all grant requirements. Bids were to be obtained through the DemandStar platform, with a non‑mandatory pre‑bid conference held on May 19, 2025, and the bid submission deadline set for July 2, 2025, at 3:00 PM. The solicitation emphasizes strict adherence to submission procedures, including one original, one electronic, and one copy of the bid, all sealed and time‑stamped by procurement staff. • Scope: Install new stormwater drainage structures and replace/upgrade water mains on North Flagler Drive. • Funding: State‑level FDEP grant (#22SRP61) with specific compliance obligations. • Procurement: Open competitive bidding via DemandStar; pre‑bid conference offered but not required. • Key dates: Pre‑bid conference – May 19 2025; Bid deadline – July 2 2025, 3 PM.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
7/2/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
ITB 24.25.133 SS

Contract value

$3,000,000

The solicitation does not disclose a contract dollar amount. Based on typical municipal stormwater and water‑main reconstruction projects of similar scale (a city arterial street), costs generally range between $2 million and $5 million, depending on length of pipe, diameter, site conditions, and grant‑related compliance work. Considering the need for both drainage structures and water‑main replacement, a reasonable midpoint estimate is roughly $3 million. This figure accounts for design, materials, labor, traffic management, and contingency for grant compliance.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Fort Myers·Florida

Top match · 73%

Downtown Stormwater Drainage Improvements - First Street Flood Risk Reduction Professional Services

Closes 10/30/2026Opened 9/28/2026

City of Charlotte·North Carolina

73% match

Fawnbrook Ln (514) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/1/2026

City of Charlotte·North Carolina

72% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of Charlotte·North Carolina

72% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Charlotte·North Carolina

72% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Charlotte·North Carolina

72% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

City of Charlotte·North Carolina

71% match

Piccadilly Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/15/2027

City of Charlotte·North Carolina

71% match

1206 Georgetown Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/15/2027

Village of North Palm Beach·Florida

71% match

Buoy Road Stormwater

Closes 11/10/2026Opened 10/8/2026

City of Charlotte·North Carolina

71% match

2500 Briargrove Dr. Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/1/2026

City of Charlotte·North Carolina

71% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Charlotte·North Carolina

71% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

Town of South Hill·Virginia

70% match

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

City of Charlotte·North Carolina

70% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

Warren County·Virginia

70% match

Linden Fire Station Drainage Improvements

Closes 10/19/2026Opened 9/23/2026

City of Charlotte·North Carolina

70% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

City of Charlotte·North Carolina

70% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Charlotte·North Carolina

70% match

Crestmont Drive (4724) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/10/2026

City of Charlotte·North Carolina

70% match

North Hoskins Rd 601 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

70% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Charlotte·North Carolina

70% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

City of Charlotte·North Carolina

70% match

6th and Graham Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027

City of Charlotte·North Carolina

70% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

70% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027

City of Charlotte·North Carolina

70% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027