This bid tabulation documents the procurement process for the Franklin Gas Line Replacement, a medium‑size utility infrastructure project in Stockton, California. The purchasing department of the Stockton Unified School District opened bids on June 14 2017, receiving submissions from three firms. While the tabulation lists line‑item amounts and totals ranging from roughly $25 k to $284 k, it does not disclose which bidder was ultimately awarded the contract. The procurement required standard items such as a bid form, bid bond, non‑collusion declaration, fingerprint verification, and site‑visit confirmation, and it referenced a potential DVBE additive, indicating a possible small‑business set‑aside requirement.
• Project scope: replacement of the Franklin gas pipeline (utility‑infrastructure work).
• Bidders: MBS Engineering, TNT Industrial, CONT (no award disclosed).
• Financial clues: line‑item totals suggest a contract value in the low‑to‑mid‑hundreds of thousands of dollars.
• Compliance: bid bond, non‑collusion, fingerprint verification, and possible DVBE additive were required.